Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
240hours of spills in 2025 between them (typical neighbourhood: about 36)
117spill events counted
United Utilities
Brook Close Csointo Timperley Brook23 spills, 84 hours in 2025
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 18.0 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 18.5 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
Freshfields, Fairy Lane - Battery StorageBeing built · 100 MW
Jan 2026 3.7 km away
Battery storage
Daines Battery Energy Storage SystemApproved, not yet built · 600 MW
May 2025 3.8 km away
Running nearest: West Didsbury Battery Storage (battery storage, 3.7 km); South Manchester Resource Recovery Centre (AD) (anaerobic digestion, 5.5 km); SAICA Paper Mill (biomass, 6.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major
Downs Drive, TimperleyUtility repair and maintenance works · SP Electricity North West · Give and take
Sept 2026 to Nov 2026 950 m away
Major, planned
Bollin Drive, TimperleyUtility repair and maintenance works · SP Electricity North West · Give and take
Sept 2026 to Nov 2026 950 m away
Major
Bollin Drive, TimperleyUtility repair and maintenance works · SP Electricity North West · Give and take
Sept 2026 to Nov 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Underground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 21.2 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 29.3 km away
Pre-application
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility.
application due July 2027 29.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.