What's changing near WA15 6QE
Within 2 km, around Timperley South in Trafford. Building, planning, schools, transport, prices and crime.
53new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.6%like-for-like prices in Timperley South, 2024 → 2025 (council +2.9%)
–crime data not published here (Greater Manchester)
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
8 new homes completedhouses · Apr 2026 – Sep 2026
Sept 2026
1.9 km away - New homes
5 new homes completedhouses · Nov 2025 – Jun 2026
Jun 2026
350 m away - New homes
18 new homes completedflats · Mar 2025
Mar 2025
1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
21homes extended 2021–2025, typically adding 29 m²
47since energy certificates began (2008)
0in WA15 6QE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
240hours of spills in 2025 between them (typical neighbourhood: about 36)
117spill events counted
- United Utilities
Brook Close Csointo Timperley Brook23 spills, 84 hours in 2025
800 m away - United Utilities
Golf Road Pumping Stationinto Timperley Brook35 spills, 79 hours in 2025
1.8 km away - United Utilities
Oakfield St Combined Sewer Overflowinto Timperley Brook26 spills, 48 hours in 2025
1.6 km away - United Utilities
Stamford New Road Csointo Timperley Brook28 spills, 27 hours in 2025
1.3 km away - United Utilities
Balfour Road Csointo Timperley Brook3 spills, 2 hours in 2025
1000 m away - United Utilities
Hawthorn Road Cso 451yjinto Timperley Brook2 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
64 planned, approved or being built and 3 running (94 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Tesco Extra AltrinchamBeing built · 500 kW
Jun 2021
2.1 km away - Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 360 kW
Apr 2024
2.3 km away - Rooftop solar
Endress & Hauser, Floats Road - Solar PV panelsApproved, not yet built · 400 kW
Jan 2025
2.4 km away - Rooftop solar
Dixons Brooklands Academy, Moor Road - Solar PanelsApproved, not yet built · 220 kW
Sept 2025
2.4 km away - Rooftop solar
Springfield Primary School, Springfield Road - Solar Panels ArrayApproved, not yet built · 180 kW
Sept 2025
2.5 km away - Rooftop solar
Timpson Road - Solar PanelsApproved, not yet built · 470 kW
May 2022
2.6 km away - Rooftop solar
Acute Building, Southmoor Road - Solar PanelsApproved, not yet built · 480 kW
Jan 2026
3.1 km away - Rooftop solar
Wythenshawe Hospital - Solar photovoltaicApproved, not yet built · 450 kW
May 2022
3.1 km away - Battery storage
Daines Battery Energy Storage SystemApproved, not yet built · 600 MW
May 2025
3.5 km away - Battery storage
Golf Road - Battery Energy StorageApproved, not yet built · 90 MW
Oct 2024
3.7 km away - Battery storage
Road and street works within 1 km
20 permitted works running now or planned, 14 of them major.
- Major, planned
Green Drive, TimperleyDisconnection or alteration of supply · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026
500 m away - Major, planned
Canal Road, TimperleyWorks for road purposes · TRAFFORD METROPOLITAN BOROUGH COUNCIL · Road closure
Jan 2027 to Jun 2027
550 m away - Major
Bradley Close, TimperleyUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026
600 m away - Major, planned
Downs Drive, TimperleyUtility repair and maintenance works · SP Electricity North West · Give and take
Sept 2026 to Nov 2026
650 m away - Major
Downs Drive, TimperleyUtility repair and maintenance works · SP Electricity North West · Give and take
Sept 2026 to Nov 2026
650 m away - Major, planned
Bollin Drive, TimperleyUtility repair and maintenance works · SP Electricity North West · Give and take
Sept 2026 to Nov 2026
650 m away - Major
Bollin Drive, TimperleyUtility repair and maintenance works · SP Electricity North West · Give and take
Sept 2026 to Nov 2026
650 m away - Major
Skelton Road, TimperleyUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Nov 2026
700 m away - Major
Deansgate Lane, TimperleyUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Sept 2026 to Oct 2026700 m away
Major infrastructure projects within 30 km
- Decideddecided Aug 2014
8.2 km away - Decideddecided Sept 2025
17.1 km away - Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027
17.7 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
18.4 km away - Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North. application due April 2027
20.9 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: West Didsbury Battery Storage (battery storage, 3.9 km); South Manchester Resource Recovery Centre (AD) (anaerobic digestion, 5.8 km); SAICA Paper Mill (biomass, 6.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.