Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
891hours of spills in 2025 between them (typical neighbourhood: about 36)
133spill events counted
United Utilities
Bowdon Wastewater Treatment Worksinto River Bollin61 spills, 605 hours in 2025
1000 m away
United Utilities
Pool Bank Farm Bowdon Cso 452l6into River Bollin71 spills, 286 hours in 2025
1000 m away
United Utilities
Cecil Road/Ashley Road Csointo Trib Of River Bollin Via Sws1 spills, 0 hours in 2025
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 14.4 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 16.4 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
application due April 2027 17.2 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 25.4 km away
Pre-application
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.