Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 16.1 km away
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
application due January 2028 17.8 km away
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
Liverpool Road, Bickerstaffe - Biomass boilerApproved, not yet built · 500 kW
Apr 2021 5.2 km away
Rooftop solar
Henry Diaper, Knowsley Industrial Park - Solar PanelsPlanning application in · 240 kW
May 2023 5.3 km away
Running nearest: Holiday Moss Landfill Gas Scheme (landfill gas, 2.4 km); Holiday Moss Gas to Energy II (landfill gas, 2.4 km); IBL Cold Stores - Solar Photovoltaics Panels (rooftop solar, 4.0 km); PROMISED LAND FARM (wind farm, 4.5 km); Sanko Gosei Solar Panels (rooftop solar, 5.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due April 2027 27.2 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 27.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.