Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
95hours of spills in 2025 between them (typical neighbourhood: about 36)
14spill events counted
United Utilities
Lodge Lane Pumping Stationinto Ellams Brook,Trib Newton Brook13 spills, 94 hours in 2025
1.8 km away
United Utilities
Grange Valley Cso (42003)into Freshwater Stteam1 spills, 0 hours in 2025
46 planned, approved or being built and 6 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Enviropax, Hall Wood Avenue - Solar PanelsApproved, not yet built · 210 kW
Mar 2026 500 m away
Rooftop solar
Bellerophon Way TescoApproved, not yet built · 400 kW
May 2019 850 m away
Rooftop solar
Newton Le Willows Health And Fitness - Solar PanelsApproved, not yet built · 280 kW
Jan 2025 2.5 km away
Rooftop solar
Starbank Panel Products, Junction Lane - Solar PanelsApproved, not yet built · 460 kW
Oct 2022 2.8 km away
Rooftop solar
Poundland Distribution Centre,Three Sisters Road - Solar PanelApproved, not yet built · 2 MW
Sept 2022 3.8 km away
Battery storage
Sandyforth Farm, Ashton Road - Battery Energy StorageApproved, not yet built · 70 MW
Feb 2025 4.7 km away
Rooftop solar
St Helens Rugby League Stadium, Peasley Cross Lane - Solar PanelsApproved, not yet built · 400 kW
Jan 2023 5.1 km away
Rooftop solar
College Street - Solar PanelsApproved, not yet built · 1 MW
Jun 2024 5.2 km away
Rooftop solar
Arnold Clark Renault, Delphwood Drive - Solar PanelsApproved, not yet built · 200 kW
Mar 2026 5.5 km away
Rooftop solar
Lockheed Road, Burtonwood & Westbrook - Solar panelsApproved, not yet built · 2 MW
Aug 2023 6.1 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 19.6 km away
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
application due January 202824.2 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Haydock East: +39% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.5% in two years.
City Plumbing, Lockheed Road - Solar PanelsApproved, not yet built · 640 kW
Jun 2024 6.1 km away
Battery storage
Biffa Electricity Generating Compound, Burtonhead Road - Battery StorageApproved, not yet built · 1 MW
Oct 2022 6.1 km away
Running nearest: Billinge Hill Quarry Landfill Scheme (landfill gas, 5.5 km); PROMISED LAND FARM (wind farm, 6.9 km); Amazon Omega Business Park (rooftop solar, 7.1 km); Holiday Moss Landfill Gas Scheme (landfill gas, 8.7 km); Holiday Moss Gas to Energy II (landfill gas, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.