Within 2 km, around Brent Valley in Ealing. Building, planning, schools, transport, prices and crime.
312new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+9.5%like-for-like prices in Brent Valley, 2024 → 2025 (council +0.7%)
+0%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
6 new homes completedhouses · Oct 2026
planned Oct 2026 1.4 km away
New homes
5 new homes completedflats · Oct 2026
planned Oct 2026 200 m away
New homes
5 new homes completedflats · Apr 2025 – Aug 2026
Aug 2026 900 m away
New homes
8 new homes completedflats · Aug 2026
Aug 2026 800 m away
New homes
7 new homes completedflats · May 2026 – Jul 2026
Jul 2026 750 m away
New homes
6 new homes completedflats · Dec 2024 – May 2026
May 2026 1.5 km away
New homes
9 new homes completedhouses · Jan 2025 – Apr 2026
Apr 2026 750 m away
New homes
9 new homes completedflats · Mar 2026
Mar 2026 1.4 km away
New homes
9 new homes completedflats · Jan 2026
Jan 2026 1.6 km away
New homes
13 new homes completedflats · Dec 2024 – Jan 2026
Jan 2026 1.4 km away
New homes
6 new homes completedflats · Nov 2025
Nov 2025 1.3 km away
New homes
5 new homes completedflats · Oct 2025
Oct 2025 1.7 km away
New homes
Planning applications within 500 m
38applications in the last 12 months
28approved · 5 refused
3still being decided
7net new homes in approved schemes since 2023
Application Under Consideration
90, Church Road, W7 3BERear roof extension (following removal of chimney); installation of two rooflight to front roofslope (Lawful Development Certificate for a Proposed Development)Ealing 262883CPL · All Other
Jul 2026 400 m away
Application Under Consideration
95, Cowper Road, W7 1ELPart first floor side extension, with part single part two storey rear extension.Ealing 262871HH · Householder
Jul 2026 100 m away
PDV
22, Endsleigh Road, W13 0RERear dormer roof extension to rear (main) roofslope (involving conversion of roofspace to habitable use); rear dormer roof extension to rear outrigger; (following demolition of existing chimney stack above roof level to rear outrigger); installation of two rooflight to front roofslope; and associated internal alterations (Application for a Lawful Development Certificate for a Proposed DevelopmentEaling 262398CPL · All Other
Jun 2026 450 m away
Approved
13, Church Road, W7 3BBDetails of Enhanced Sound Insulation Values pursuant to Condition 10 of planning permission ref: 260878FUL dated 27th April 2026Ealing 262362CND · All Other
Jun 2026 450 m away
Approved
13, Church Road, W7 3BBDetails of Noise Assessment Report pursuant to Condition 7 of planning permission ref: 260878FUL dated 27th April 2026Ealing 262271CND · All Other
Jun 2026 450 m away
REF
46, Shakespeare Road, W7 1LSAlteration of roof from hip to gable end, rear outrigger extension above existing two storey back addition; single storey rear infill extension (following demolition of the existing extension)Ealing 261734HH · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
118hours of spills in 2025 between them (typical neighbourhood: about 36)
51spill events counted
Thames Water
N/Ainto Not Applicable39 spills, 98 hours in 2025
1.3 km away
Thames Water
Trumpers Way, W7into River Brent7 spills, 9 hours in 2025
1.6 km away
Thames Water
N/Ainto Not Applicable4 spills, 6 hours in 2025
1.5 km away
Thames Water
N/Ainto Not Applicable1 spills, 5 hours in 2025
1.1 km away
Thames Water
N/Ainto Not Applicable0 spills, 0 hours in 2025
900 m away
Thames Water
Hanger Lane Csointo River Brent0 spills, 0 hours in 2025
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
10 new homes completed6 flats, 4 houses · Apr 2025 – May 2025
May 2025 1.6 km away
New homes
18 new homes completedflats · May 2025
May 2025 1.4 km away
New homes
9 new homes completedflats · Apr 2025
Apr 2025 1.9 km away
New homes
93 new homes completedflats · Apr 2025
Apr 2025 1.5 km away
New homes
5 new homes completedflats · Feb 2025
Feb 2025 1.4 km away
New homes
6 new homes completedflats · Jan 2025
Jan 2025 700 m away
New homes
5 new homes completedflats · Dec 2024
Dec 2024 750 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 48 postcodes nearby had new homes completed in the last two years.
Apr 2026 100 m away
REF
70, Greenford Avenue, W7 3QPPart single part two storey rear extension; alterations to fenestration including insertion of additional window to side elevation on first floor level; and associated internal and external alterationsEaling 261322HH · Householder
Apr 2026 350 m away
PDV
62, Shakespeare Road, W7 1LSRear roof dormer extension incorporating a Juliet balcony; insertion of additional window to side elevation first floor level; and installation of two front rooflightsEaling 261675CPL · All Other
Apr 2026 0 m away
Approved
62, Shakespeare Road, W7 1LSSingle storey rear extension with raised patio (following demolition of existing garage)Ealing 261669HH · Householder
Apr 2026 0 m away
Approved
149, Framfield Road, W7 1NQSingle storey side infill extension and alterations to fenestrationEaling 261585HH · Householder
Apr 2026 450 m away
Approved
76, Eccleston Road, W13 0RLDeconversion of two self contained flats to single dwellinghouse (Use Class C3) and associated internal alterations; (Lawful Development Certificate for a Proposed Development)Ealing 261587CPL · All Other
Apr 2026 350 m away
REF
70, Greenford Avenue, W7 3QPChange of use from a dwellinghouse (Use Class C3) into to a 12 bedrooms -House in Multiple Occupation (HMO)for up to 12 residents (Use Class Sui Generis); together with a single storey side/rear infill extension; first-floor infill extension; alterations to side elevation fenestrations; associated external and internal alterations; with and provision of refuse storage, cycle storage and amenity spEaling 261348FUL · All Other · 1 homes proposed
Mar 2026 350 m away
PDV
52, Cowper Road, W7 1EHConstruction of rear dormer; installation of four front rooflights (Application for a Lawful Development Certificate for a Proposed Development)Ealing 261302CPL · All Other
Mar 2026 150 m away
Application Under Consideration
71, Homefarm Road, W7 1NLFormation of vehicle crossover including installation of a dropped kerb and provision of hardstandingEaling 260807HH · Householder
Mar 2026 500 m away
PDV
19, Framfield Road, W7 1NGRear roof extension to main roofslope; roof extension to rear outrigger; installation of two front rooflightsEaling 261167CPL · All Other
Mar 2026 450 m away
Approved
13, Church Road, W7 3BBConversion of existing single dwellinghouse (Use Class C3), into two self contained residential dwellings; alterations to side elevation fenestration; including installation of new entrance doorsEaling 260878FUL · All Other · 3 homes proposed
Feb 2026 450 m away
Approved
16, Allingham Close, W7 1NASingle storey front and rear extension; alteration to front external elevationsEaling 260804HH · Householder
Feb 2026 150 m away
Approved
14, Grove Avenue, W7 3EPSide extension to existing to extend line with the back of existing building, Repositioning existing side door access (following demolition of existing)Ealing 260720HH · Householder
Feb 2026 500 m away
Not Required
35, Dryden Avenue, W7 1ESSingle storey (Max 5m deep and Max 3m high) rear extension (42 days Prior Notification Process)Ealing 260358PALHE · Prior Approval
Jan 2026 350 m away
Approved
78, Cowper Road, W7 1EJApplication for a Non-Material Amendment (S96a) to planning permission ref: 241410HH dated 31/05/2024 for: Single storey rear extension; installation of two rooflight to the rear dormer. Amendment seeks reduction in roof height and alterations to fenestrationEaling 260250NMA · All Other
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Unit 6, Origin Business Park, Rainsford Road - Solar PanelsApproved, not yet built · 270 kW
May 2023 4.0 km away
Rooftop solar
Unit 5, Origin Business Park, Rainsford Road - Solar PanelsApproved, not yet built · 550 kW
May 2023 4.0 km away
Running nearest: Southall Lane Waste Depot (battery storage, 5.5 km); Mogden STW (other, 5.6 km); Western International Market (rooftop solar, 5.6 km); Western International Market (WIM) Site (battery storage, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Drayton Bridge Road, West EalingNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Two-way signals
Nov 2026 to Nov 2026 500 m away
Standard
Greenford Avenue, HanwellUtility asset works · CADENT GAS LIMITED · Multi-way signals
Feb 2027 to Feb 2027 500 m away
Standard
Leeland Terrace, West EalingUtility asset works · LONDON BOROUGH OF EALING · Multi-way signals
Oct 2026 to Oct 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · Land at 342 Edinburgh Avenue, Slough Trading Estate, Slough, Berkshire, SL1 4TU.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.