Within 2 km, around South Ealing in Ealing. Building, planning, schools, transport, prices and crime.
1,062new homes completed within 2 km, last 2 years
593homes given permission on brownfield sites since 2021
+4.7%like-for-like prices in South Ealing, 2024 → 2025 (council +0.7%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
69 new homes completedflats · Aug 2025 – Oct 2026
planned Oct 2026 1.5 km away
New homes
14 new homes completedflats · Oct 2026
planned Oct 2026 1.4 km away
New homes
8 new homes completedflats · Aug 2026
Aug 2026 1.8 km away
New homes
42 new homes completedflats · Jan 2025 – Aug 2026
Aug 2026 1.5 km away
New homes
7 new homes completedflats · May 2026 – Jul 2026
Jul 2026 1.9 km away
New homes
31 new homes completedflats · Mar 2026 – May 2026
May 2026 1.4 km away
New homes
9 new homes completed8 flats, 1 houses · May 2026
May 2026 500 m away
New homes
6 new homes completedflats · Dec 2024 – May 2026
May 2026 1.0 km away
New homes
9 new homes completedflats · May 2026
May 2026 850 m away
New homes
27 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026 1.4 km away
New homes
52 new homes completedflats · Feb 2026
Feb 2026 2.0 km away
New homes
55 new homes completedflats · Feb 2026
Feb 2026 2.0 km away
Planning applications within 500 m
42applications in the last 12 months
28approved · 6 refused
8still being decided
1net new homes in approved schemes since 2023
Application Received
169, Boston Manor Road, TW8 9LE169 Boston Manor RoadHounslow P/2026/2767 · All Other
Sept 2026 350 m away
Application Received
Myers Court, Flat 3, Reynard Way, TW8 9GDMyers CourtHounslow P/2026/2607 · All Other
Sept 2026 450 m away
Application Received
15, The Ride, TW8 9LBErection of a single storey rear extension and rear decking to the house.Hounslow P/2026/2384 · Householder
Aug 2026 300 m away
Application Under Consideration
82, Ealing Park Gardens, W5 4EUInstallation of a split outdoor condenser unit; for an air conditioning system (Lawful Development Certificate for a Proposed Development)Ealing 262950CPL · All Other
Jul 2026 250 m away
Application Under Consideration
167, Murray Road, W5 4DDSingle storey rear extension (following demolition of existing rear addition); removal of chimney breast; and alterations to the fenestrationEaling 262878HH · Householder
Jul 2026 200 m away
Approved
66, Whitestile Road, TW8 9NLErection of a single storey rear extension and infill extension to the house. Following the demolition of the rear extension.Hounslow P/2026/1951 · Householder
Jul 2026 400 m away
Application Under Consideration
108, Murray Road, W5 4DATwo-storey side extension and rear ground-floor extensionEaling 262606HH · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Thames Water
South Ealing Road, W5into River Brent0 spills, 0 hours in 2025
900 m away
Thames Water
Hanger Lane Csointo River Brent0 spills, 0 hours in 2025
26 new homes completed20 flats, 6 houses · Dec 2025
Dec 2025 1.4 km away
New homes
5 new homes completedflats · Oct 2025
Oct 2025 800 m away
New homes
64 new homes completedflats · Jul 2025 – Sep 2025
Sept 2025 1.9 km away
New homes
84 new homes completedflats · May 2025 – Sep 2025
Sept 2025 2.0 km away
New homes
14 new homes completedflats · Sep 2025
Sept 2025 1.9 km away
New homes
7 new homes completedflats · Aug 2025
Aug 2025 1.8 km away
New homes
48 new homes completedflats · Jul 2025
Aug 2025 1.9 km away
New homes
27 new homes completedflats · Jun 2025
Jun 2025 1.5 km away
New homes
42 new homes completedflats · Jun 2025
Jun 2025 1.5 km away
New homes
18 new homes completedflats · May 2025
May 2025 1.5 km away
New homes
74 new homes completedflats · Mar 2025 – Apr 2025
Apr 2025 2.0 km away
New homes
93 new homes completedflats · Apr 2025
Apr 2025 2.0 km away
New homes
68 new homes completedflats · Mar 2025
Mar 2025 2.0 km away
New homes
5 new homes completedflats · Feb 2025
Feb 2025 1.4 km away
New homes
6 new homes completedflats · Jan 2025
Jan 2025 1.8 km away
New homes
5 new homes completedflats · Dec 2024
Dec 2024 1.8 km away
Planning permission
Permission for 6 homesLayton Court - Hounslow '5000 Pledge', GARAGES TO THE REAR OF, LAYTON COURT, BROOK LANE NORTH (full planning permission)
Jan 2022 800 m away
Planning permission
Permission for 69 homes50, London Road (full planning permission)
May 2021 1.5 km away
Planning permission
Permission for 105 homesMETROPOLITAN POLICE, HALF ACRE (full planning permission)
Apr 2021 1.3 km away
Planning permission
Permission for 215 homesMORRISONS, 228-246, High Street (other)
Apr 2021 1.4 km away
Planning permission
Permission for 193 homes40 and 40A, High Street (full planning permission)
Mar 2021 1.5 km away
Planning permission
Permission for 5 homesLAND AT ORCHARD ROAD AND, WINDMILL ROAD (full planning permission)
Mar 2021 850 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 58 postcodes nearby had new homes completed in the last two years.
Refused
124, Boston Manor Road, TW8 9LNFormation of vehicular access to the front of the property.Hounslow P/2026/1839 · Householder
Jun 2026 450 m away
Approved
66, Whitestile Road, TW8 9NLCertificate of lawfulness for proposed erection of a rear roof extension with a Juliet balcony and windows to match.Hounslow P/2026/1742 · All Other
Jun 2026 400 m away
Application Under Consideration
Orion Park, Northfield Avenue, W13 9SJMinor material amendments (S.73) to vary condition no. 2 (Approved Plans), 3 (Demolition and Site Clearance), 7 (Cycle Parking Spaces), 9 (Site Wide Car and Cycle Parking Management Strategy), 10 (Foundation Method Statement), 11 (Remediation), 13 (Drainage Strategy), 14 (Piling Method Statement),15 (Refuse and Recycling), 22 (Passenger Lifts), 26 (Business Hours), 27 (Commercial Units Use Class)Ealing 262479VAR · All Other
38, Hereford Road, W5 4SERear roof extension, and installation of three roof lights to front roofslope (Lawful Development Certificate for a Proposed Development)Ealing 262482CPL · All Other
Jun 2026 500 m away
Approved
8A, Junction Road, W5 4XLConversion of an existing single storey detached outbuilding to a self-contained residential unit (Use Class C3); associated external alterations; and provision of cycle and refuse storage.Ealing 262322FUL · All Other · 1 homes proposed
Jun 2026 400 m away
Approved
1, Swyncombe Avenue, W5 4DRErection of a replacement two storey side extension, replacement single storey rear extension and rear roof dormer extension and installation of triple glazed replacement ground and first floor front windows and first floor rear windows and a replacement ground floor front door to the house.Hounslow P/2026/1369 · Householder
May 2026 100 m away
Approved
35, Ealing Park Gardens, W5 4EXAlteration of roof from hip to gable end; rear roof extension; installation of two rooflights to front roofslope; installation of window to side gableEaling 262111HH · Householder
May 2026 150 m away
Approved
Site Of Former Orion Park, Northfield Avenue, W13 9SJSubmission of details to partially discharge Part 2 of Condition 11 (Remedial Strategy/Method Statement); attached to planning permission 171721FUL dated 02 February 2018, as varied by planning references 213744VAR dated 08 December 2021 in so far as it relates to Phase 2 onlyEaling 262163CND · All Other
May 2026 500 m away
Approved
Orion Park, Northfield Avenue, W13 9SJSubmission of details to partially discharge Part 1 of Condition 11 (Contaminated Land Site Investigation); attached to planning permission 171721FUL dated 02 February 2018, as varied by planning references 213744VAR dated 08 December 2021 in so far as it relates to Phase 2 onlyEaling 262071CND · All Other
May 2026 500 m away
Refused
8A, Junction Road, W5 4XLChange of use of a single storey commercial outbuilding into dwellinghouse (C3) with provision of cycle storage; refuse storage, and boundary fence (Class MA, 56 day Prior Approval Process)Ealing 262077PACBSD · Prior Approval · 1 homes proposed
May 2026 400 m away
Approved
1, Avenue Road, TW8 9NSThe application site comprises a single-family terraced dwellinghouse. The property is not a flat or maisonette and is not a listed building. The proposed development is located to the rear of the original dwellinghouse. The extension will: • Extend 3.50 metres from the original rear wall of the house • Have a maximum overall height of 3.090 metres • Have a flat roof design to minimise visuHounslow P/2026/1248 · Householder
Apr 2026 450 m away
Approved
94, Ground Floor Flat, Murray Road, W5 4DAApplication for a Non-Material Amendment (S96a) seeking roof height revisions to the approved extension, in relation to planning permission ref. 242699FUL dated 13/09/2024 for a single storey side-to-rear wraparound extension.Ealing 261641NMA · All Other
Apr 2026 350 m away
Application Under Consideration
174, Carlyle Road, W5 4BJContinue to use the property as two self-contained flats (Lawful Development Certificate for an Existing Use)Ealing 261590CPE · All Other
17, The Ride, TW8 9LBGround floor rear extension. 2 no. rooflight to the front main roof slope.Hounslow P/2026/1008 · Householder
Apr 2026 300 m away
PDV
13, Julien Road, W5 4XARear roof extension, and installation of two roof lights to front roofslope (Lawful Development Certificate for a Proposed Development)Ealing 261588CPL · All Other
Apr 2026 400 m away
Refused
2, Avenue Road, TW8 9NSRemoval of the existing front and rear dormer windows and the erection of new dormer extensions to the front and rear roof slopes.Hounslow P/2026/1092 · Householder
Apr 2026 450 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Alexandra Junior School - Roof Mounted Solar SystemApproved, not yet built · 150 kW
Sept 2021 3.9 km away
Rooftop solar
Unit 5, Origin Business Park, Rainsford Road - Solar PanelsApproved, not yet built · 550 kW
May 2023 4.7 km away
Running nearest: Mogden STW (other, 3.9 km); Southall Lane Waste Depot (battery storage, 6.4 km); Western International Market (rooftop solar, 6.5 km); Western International Market (WIM) Site (battery storage, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Windmill Road, BrentfordUtility asset works · Electricity Network Company Limited · Multi-way signals
Nov 2026 to Nov 2026 550 m away
Standard
Boston Park Road, BrentfordUtility asset works · Electricity Network Company Limited · Some carriageway incursion
Nov 2026 to Nov 2026 600 m away
Standard
Wellmeadow Road, HanwellUtility asset works · CADENT GAS LIMITED · Multi-way signals
Nov 2026 to Nov 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
decided May 2018 22.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.