What's changing near W3 6TH
Within 2 km, around North Acton in Ealing. Building, planning, schools, transport, prices and crime.
1,389new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.6%like-for-like prices in North Acton, 2024 → 2025 (council +0.7%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
24 new homes completedflats · Oct 2026
planned Oct 2026
2.0 km away - New homes
32 new homes completed30 flats, 2 houses · May 2026 – Oct 2026
planned Oct 2026
150 m away - New homes
22 new homes completedflats · Oct 2026
Oct 2026
2.0 km away - New homes
5 new homes completedflats · Jul 2025 – Sep 2026
Sept 2026
1.1 km away - New homes
5 new homes completedflats · Sep 2026
Sept 2026
1.5 km away - New homes
8 new homes completedhouses · Aug 2026
Aug 2026
1.3 km away - New homes
91 new homes completedflats · Apr 2026 – Jul 2026
Jul 2026
350 m away - New homes
9 new homes completedflats · Jul 2026
Jul 2026
700 m away - New homes
8 new homes completedflats · Jun 2026
Jun 2026
1.1 km away - New homes
77 new homes completedflats · Apr 2026 – Jun 2026
Jun 2026
400 m away - New homes
59 new homes completedflats · Apr 2026 – Jun 2026
Jun 2026
400 m away - New homes
34 new homes completedflats · Apr 2026 – Jun 2026
Jun 2026
400 m away - New homes
Planning applications within 500 m
66applications in the last 12 months
34approved · 8 refused
11still being decided
716net new homes in approved schemes since 2023
- Application Under Consideration
-, Victoria Industrial Estate, Victoria Road, W3 6UUMinor external alterations and the change of use from Class B8 to B2 and B8.OPDC 26/0170/FULOPDC · All Other
Oct 2026
400 m away - Application Under Consideration
0, Victoria RoadInstallation of digital display in self supported structure over existing containers.OPDC 26/0161/FULOPDC · All Other
Sept 2026
450 m away - Application Under Consideration
1, Portal Way, W3 6RSDischarge of condition 41 (Phasing Plan) pursuant to planning permission reference 21/0181/OUTOPDC (as subsequently amended by ref: 25/0211/NMAOPDC) for 'Hybrid planning application (part full/part outline) for the demolition of all buildings and phased redevelopment to provide up to seven buildings. Full planning permission is sought for a building comprising residential units (Class C3) flexibleOPDC 26/0146/AODOPDC · All Other
Sept 2026
250 m away - Application Under Consideration
0, Unit 5-7, Park Royal Road, W3 6XADischarge of condition 7 (Construction Logistics Plan) (site-wide) and partial discharge of condition 8 (Construction and Environmental Management Plan) in relation to demolition and enabling works for Building A, pursuant to planning permission reference 23/0014/FUMOPDC dated 27/03/2025 for 'Demolition of all existing buildings and structures and the redevelopment of the sites through constructioOPDC 26/0138/AODOPDC · All Other
Aug 2026
450 m away - NOOBJ
1, Woodward Buildings, Imperial College Office, Victoria Road, W3 6FAInstallation of two wooden poster-boards to the fence at the intersection of Victoria Road and Chase Road. (Out of Borough Consultation from the OPDC)Ealing 263151OPDCOB · All Other
Aug 2026
350 m away
34homes extended 2021–2025, typically adding 32 m²
66since energy certificates began (2008)
2in W3 6TH itself
- Extendedcertificate 2024
- Extendedcertificate 2021
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
81 planned, approved or being built and 1 running (6 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Light House, Western Road - Solar PanelsApproved, not yet built · 430 kW
Aug 2024
850 m away - Rooftop solar
Nucleus, Central Way - Solar PanelsApproved, not yet built · 160 kW
Oct 2023
1.4 km away - Rooftop solar
Nucleus, Central Way - Solar PanelsApproved, not yet built · 320 kW
Aug 2023
1.4 km away - Rooftop solar
Charlie Bighams, Mcnicol Drive - Solar PanelsApproved, not yet built · 340 kW
Feb 2024
1.5 km away - Rooftop solar
Central Way - Solar PanelsApproved, not yet built
May 2025
1.5 km away - Rooftop solar
Unit 1, Origin Business Park, Rainsford Road - Solar PanelsApproved, not yet built · 690 kW
May 2023
1.6 km away - Rooftop solar
Rock Building, Waxlow Road - Solar panelsApproved, not yet built · 370 kW
Dec 2023
1.7 km away - Rooftop solar
Unit 4, Origin Business Park, Rainsford Road - Solar PanelsApproved, not yet built · 990 kW
May 2023
1.7 km away - Rooftop solar
Unit 3, Origin Business Park, Rainsford Road - Solar PanelsApproved, not yet built · 510 kW
May 2023
1.7 km away - Rooftop solar
Unit 2, Origin Business Park, Rainsford Road - Solar PanelsApproved, not yet built · 290 kW
May 2023
1.7 km away
Road and street works within 1 km
33 permitted works running now or planned, 12 of them major.
- Major, planned
Portal Way, ActonHighway improvement works · LONDON BOROUGH OF EALING · Lane closure
Sept 2026 to Dec 2026
300 m away - Major
Portal Way, ActonHighway improvement works · LONDON BOROUGH OF EALING · Lane closure
Sept 2026 to Dec 2026
300 m away - Major
Portal Way, ActonUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Oct 2026 to Oct 2026
350 m away - Major
Wales Farm Road, ActonUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Oct 2026 to Oct 2026
450 m away - Major
Kathleen Avenue, ActonUtility repair and maintenance works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Jan 2025 to Dec 2026
450 m away - Major
Victoria Road, ActonUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Oct 2026 to Oct 2026
550 m away - Major, planned
Westbourne Avenue, ActonUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Nov 2026 to Dec 2026
600 m away - Major
Grasmere Avenue, ActonUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Oct 2026 to Nov 2026
650 m away - Major
Perryn Road, ActonStatutory Infrastructure Works · THAMES WATER · Road closure
Nov 2026 to Nov 2026850 m away
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2027
8.2 km away - Decideddecided Sept 2014
10.6 km away - Pre-applicationapplication due December 2027
14.2 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
15.1 km away - Decideddecided Apr 2014
17.6 km away - Decideddecided Feb 2017
18.9 km away - Pre-application
Transport schemes within 20 km
- Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
1.3 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
5.9 km away - TransportMay 2022
6.2 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
9.6 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
10.4 km away
ApprovedThe Perfume Factory, Wales Farm Road, W3 6UGApplication for a Non-Material Amendment in (S96a) seeking to allow to revise the proposed mezzanine slab space in relation to planning permission reference 181062OPDFUL dated 10/08/2021 for: Demolition of existing buildings to provide 3 buildings comprising residential units and flexible commercial floorspace, the provision of public open space, roof top amenity space, landscaping, car and cycleEaling 262613OPDNMA · All Other
Jun 2026
450 m away Withdrawn-, Victoria Industrial Estate, Victoria Road, W3 6UUChange of use from Class B8 to Class E(g), B2 and B8 and external alterations including ventilation vents and windows, installation of a distiller and a demonstration facility and associated plant, and cycle parking.OPDC 26/0081/FULOPDC · All Other
Apr 2026
400 m away Unit 5, Origin Business Park, Rainsford Road - Solar PanelsApproved, not yet built · 550 kW
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.