What's changing near W10 6PY
Within 2 km, around North Kensington in Kensington and Chelsea. Building, planning, schools, transport, prices and crime.
1,256new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-5.5%like-for-like prices in North Kensington, 2024 → 2025 (council -0.6%)
-12%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
87 new homes completedflats · Oct 2025 – Sep 2026
Sept 2026
750 m away - New homes
61 new homes completedflats · Mar 2026 – Sep 2026
Sept 2026
700 m away - New homes
17 new homes completedflats · Aug 2026 – Sep 2026
Sept 2026
150 m away - New homes
22 new homes completedflats · Jul 2026 – Sep 2026
Sept 2026
350 m away - School closed
School closed: Catch22 Include LondonOther independent special school, other independent special school (closure)
Aug 2026
600 m away - New homes
8 new homes completedflats · Aug 2026
Aug 2026
2.0 km away - New homes
6 new homes completedflats · Jul 2026
Jul 2026
1.2 km away - New homes
8 new homes completedflats · Apr 2026 – Jun 2026
Jun 2026
1.9 km away - New homes
7 new homes completedflats · Mar 2026
Mar 2026
1.2 km away - New homes
23 new homes completed19 flats, 4 houses · Mar 2026
Mar 2026
1.3 km away - New homes
7 new homes completedflats · Feb 2026
Feb 2026
1.9 km away - New homes
8 new homes completedflats · Jan 2026
Jan 2026
1.7 km away
Planning applications within 500 m
28applications in the last 12 months
12approved · 0 refused
11still being decided
27net new homes in approved schemes since 2023
- Application Under Consideration
39 Flat C, St Quintin Avenue, W10 6NZLoft conversion to form an additional bedroom, with dormer window and juliet balconyKensington & Chelsea PP/26/05198 · All Other
Oct 2026
250 m away - Application Under Consideration
39 Flat C, St Quintin Avenue, W10 6NZAddition of edge protection to perimeter of existing flat roof (currently used for plant access), addition of new decking to protect waterproof membrane, and change of use to accessible roof terrace.Kensington & Chelsea PP/26/05217 · All Other
Oct 2026
250 m away - Application Received
Network Rail Land C/O Latimer Road, WestwayLoft conversion with addition of two dormers on the rear; introduction of three skylights on front roofHammersmith & Fulham P/2026/02331/OBS · All Other
Sept 2026
250 m away - Application Received
White City Campus, Westway, W12 0FDWhite City Campus - ImperialHammersmith & Fulham P/2026/02312/TREE · All Other
Sept 2026
400 m away - Application Received
7, Wood Lane, W12 0HTReplacement of all existing single glazed timber framed windows with new double glazed timber framed windows; replacement of existing single glazed timber framed doors with new double glazed timber framed doors at the front elevation; replacement of existing single glazed timber framed door with a new double glazed uPVC framed door to the rear elevation.Hammersmith & Fulham P/2026/01569/FR3 · All Other
Jul 2026
500 m away - Application Received
90, Wood Lane, W12 0BZDisplay of double sided internally illuminated LCD digital screen measuring 2100mm (height) x 1338mm (width) at relocated bus shelter on the public highway.
41homes extended 2021–2025, typically adding 56 m²
110since energy certificates began (2008)
3in W10 6PY itself
- Extendedcertificate 2020
- Extendedcertificate 2017
- Extendedcertificate 2016
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
78 planned, approved or being built and 0 running. Those within 5 km are on the map above.
- Rooftop solar
Kensington Leisure Centre, Silchester Road - Solar ArrayApproved, not yet built · 170 kW
Feb 2023
500 m away - Rooftop solar
Hammersmith Hospital, Du Cane Road - Solar PV PanelsApproved, not yet built · 170 kW
Jul 2025
1000 m away - Rooftop solar
Westfield London Shopping Centre, Ariel Way - Solar PanelsPlanning application in · 1 MW
Jun 2023
1.1 km away - Rooftop solar
Westfield London Shopping Centre, Ariel Way - Solar PanelsPlanning application in · 330 kW
Jan 2026
1.1 km away - Rooftop solar
Kern House, Scrubs Lane - Solar PanelsApproved, not yet built
Sept 2023
1.1 km away - Rooftop solar
Phoenix Fitness Centre, Phoenix Close - Solar PanelsApproved, not yet built · 180 kW
Mar 2024
1.2 km away - Rooftop solar
Moberly Sports Centre - Photovoltaic ArraysApproved, not yet built · 170 kW
Dec 2021
1.5 km away - Rooftop solar
Willesden Sports Centre, Donnington Road - Solar PanelsApproved, not yet built · 310 kW
Mar 2025
2.6 km away - Rooftop solar
Crompton Street - Solar Photovoltaic ArrayApproved, not yet built · 200 kW
Nov 2021
3.0 km away - Rooftop solar
The Queens Club, Palliser Road - Solar panelsApproved, not yet built · 520 kW
May 2023
3.5 km away
Road and street works within 1 km
33 permitted works running now or planned, 16 of them major.
- Major, planned
Wood Lane, LondonHighway repair and maintenance works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Lane closure
Aug 2026 to Oct 2026
450 m away - Major
Wood Lane, LondonHighway repair and maintenance works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Lane closure
Aug 2026 to Oct 2026
450 m away - Major, planned
Caverswall Street, LondonHighway repair and maintenance works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Some carriageway incursion
Sept 2026 to Oct 2026
450 m away - Major
Caverswall Street, LondonHighway repair and maintenance works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Some carriageway incursion
Sept 2026 to Oct 2026
450 m away - Major, planned
Wood Lane, LondonHighway improvement works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Lane closure
Oct 2026 to Dec 2026
450 m away - Major
Wood Lane, LondonHighway improvement works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Lane closure
Oct 2026 to Dec 2026
450 m away - Major, planned
Wood Lane, LondonHighway repair and maintenance works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Road closure
Feb 2027 to Mar 2027
500 m away - Major, planned
Wood Lane, LondonHighway repair and maintenance works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Lane closure
Mar 2027 to Jun 2027
500 m away - Major
Wood Lane, LondonHighway improvement works · LONDON BOROUGH OF HAMMERSMITH & FULHAM · Lane closure
Major infrastructure projects within 30 km
- Decideddecided Sept 2014
7.5 km away - Pre-applicationapplication due March 2027
10.1 km away - Decideddecided Apr 2014
15.3 km away - Pre-applicationapplication due March 2028
15.9 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
16.2 km away - Decideddecided Feb 2017
16.7 km away - Pre-application
Transport schemes within 20 km
- Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
2.1 km away - TransportMay 2022
3.1 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
5.7 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
6.9 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
7.6 km away
Application Under Consideration44A, Eynham Road, W12 0HAErection of a rear roof extension; erection of a rear extension at second floor level, over part of the existing back addition; installation of 3no. rooflights in the front roofslope, following the removal of an existing rooflight; removal of an existing rooflight, on top of the roof of existing first floor back addition.Hammersmith & Fulham 2025/03124/FUL · All Other
Dec 2025
350 m away Approved24 Kelfield Gardens, LONDON, W10 6NBDetails required by condition nos. 7 (Construction Traffic Management Plan (CTMP)) and 8 (Professional management of engineering works) of planning permission 23/04926 (Remodelling and refurbishment of house, including external landscaping, excavation of basement with front and rear light wells, side and rear infill ground floor extensions and a dormer roof to main rear roof of building)Kensington & Chelsea CON/25/06494 · All Other
Oct 2025
100 m away DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.