What's changing near UB9 5HT
Within 2 km, around Denham in Buckinghamshire. Building, planning, schools, transport, prices and crime.
7new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+10.2%like-for-like prices in Denham, 2024 → 2025 (council +2.0%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
30homes extended 2021–2025, typically adding 39 m²
46since energy certificates began (2008)
2in UB9 5HT itself
- Extendedcertificate 2022
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
26 planned, approved or being built and 5 running (11 MW between them). Those within 5 km are on the map above.
- Battery storage
Gerrards Cross Sewage Treatment WorksPlanning application in · 20 MW
Dec 2020
2.1 km away - Battery storage
Pinstone Farm, Oxford Road - Battery Energy Storage SystemPlanning application in · 60 MW
Jul 2025
2.4 km away - Rooftop solar
Tims Dairy, Denham Lane - Solar PanelsPlanning application in · 220 kW
May 2026
3.3 km away - Rooftop solar
Hillingdon Sports & Leisure Centre - Solar PanelsApproved, not yet built · 220 kW
Jan 2024
4.2 km away - Rooftop solar
Micro House, Bury Street - Solar ArraysApproved, not yet built
Apr 2025
4.5 km away - Rooftop solar
Northwood Health And Racquet Club, Ducks Hill Road - Solar Pv PanelsPlanning application in · 330 kW
Jul 2023
5.2 km away - Rooftop solar
Northwood College, Maxwell Road - Solar PanelsApproved, not yet built
Jul 2023
5.9 km away - Rooftop solar
Hillingdon Hospital, Pield Heath Road - Solar PV PanelsApproved, not yet built · 190 kW
Sept 2025
6.9 km away - Rooftop solar
Hillingdon Hospital - Hospital RedevelopmentApproved, not yet built
Jan 2023
6.9 km away - Solar farm
Bullsland Farm - Solar ArrayApproved, not yet built · 320 kW
Jan 2022
7.1 km away
Road and street works within 1 km
5 permitted works running now or planned.
- Standard
North Orbital Road, DenhamNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Nov 2026 to Nov 2026
200 m away - Standard
Moorfield Road, DenhamWorks for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
Oct 2026 to Oct 2026
350 m away - Standard
North Orbital Road, DenhamWorks for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
Oct 2026 to Oct 2026
850 m away - Standard
Denham Avenue, DenhamWorks for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
Aug 2027 to Aug 2027
950 m away - Minor
Station Parade, DenhamUtility repair and maintenance works · AFFINITY WATER - C · No carriageway incursion
Oct 2026 to Oct 2026
350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027
6.5 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
10.8 km away - Decideddecided Nov 2023
11.0 km away - Pre-applicationapplication due December 2027
12.8 km away - Pre-applicationapplication due March 2027
17.6 km away - Decided
Transport schemes within 20 km
- Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
18.6 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
19.0 km away
Running nearest: Springfield Farm (landfill gas, 3.9 km); Mount Vernon Hospital - Solar Panels (rooftop solar, 5.2 km); Wapsey's Wood III (landfill gas, 6.6 km); Wapsey's Wood II Landfill Site (landfill gas, 6.6 km); Wapsey's Wood (landfill gas, 6.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.