46, Minterne Avenue, UB2 4HPPart two, part single storey side/rear extension; front porch extension; alteration of roof from hip to gable end, rear roof extension; two rear Juliet balconies; installation of four front rooflights and one rear rooflight (following demolition of existing side garage)Ealing 262806HH · Householder
Jul 2026 500 m away
Application Under Consideration
12, Warwick Road, UB2 4NXConversion of the dwelling from a small 6 bed HMO (C4) into a large 7 bed HMO (Sui Generis); construction of rear roof extension with provision of bin storage and bike storageEaling 262690FUL · All Other
Jul 2026 200 m away
Approved
46, Shaftesbury Avenue, UB2 4HJPart single, part two storey rear extension (following demolition of existing rear addition); rear dormer window roof extensionEaling 262671HH · Householder
Jul 2026 450 m away
Approved
The Arches Business Centre, Merrick Road, UB2 4AUDetails of brown roofs pursuant to Condition 60 of Planning Permission ref: 181380FUL, dated 22.12.2021, amended under Planning Permission ref: 260143NMA, dated 20.03.2026 for 'Demolition of existing structures and residential-led, mixed use redevelopment to provide four buildings ranging in height from 15 to 23 storeys comprising residential (575 units), 2,100 sqm of B1(a) office floorspace, 449
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport
application due November 2027 7.2 km away
Decided
Slough Multifuel Extension ProjectGenerating Stations · Land at 342 Edinburgh Avenue, Slough Trading Estate, Slough, Berkshire, SL1 4TU.
decided Nov 2023 17.8 km away
Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
27, Hunt Road, UB2 4PZSingle storey (max 6.00m deep and max 3.60m high) rear extension (following demolition of existing rear extension) (42 Days Prior Approval Notification Process)Ealing 262457PALHE · Prior Approval
Jun 2026 100 m away
Not Required
25, Hunt Road, UB2 4PZSingle storey (Max 6m deep and Max 3.60m high) rear extension (42 days Prior Notification Process)Ealing 262463PALHE · Prior Approval
Jun 2026 100 m away
Not Required
23, Marlow Road, UB2 4NSSingle storey (max 6.00m deep and max 3.00m high) rear extension (following demolition of existing rear extension) (42 Days Prior Approval Notification Process)Ealing 262381PALHE · Prior Approval
Jun 2026 350 m away
Approved
73, Havelock Road, UB2 4PBSingle storey rear outbuilding to be used as ancillary residential accommodation to main dwellinghouseEaling 262295HH · Householder
Jun 2026 200 m away
PDV
4, Marlow Road, UB2 4NSRear roof extension with Juliet balcony (following removal of existing vent pipe); installation of three roof lights to the front roofslope (Application for a Certificate of Lawful Development for a Proposed Development).Ealing 262118CPL · All Other
Jun 2026 350 m away
Refused
4, Marlow Road, UB2 4NSSingle storey rear extension (max 6m deep and max 2.9m high) (42 Days Prior Approval Notification Process)Ealing 262117PALHE · Prior Approval
Jun 2026 350 m away
PDV
3, Marlow Road, UB2 4NSRear roof extension incorporating Juliet balcony; installation of three rooflights to front roofslope (Lawful Development Certificate for a Proposed Development)Ealing 262089CPL · All Other
May 2026 350 m away
Refused
3, Marlow Road, UB2 4NSSingle storey rear extension (max 6m deep and max 3.96m high) (following the demolition of existing rear structures and rear outbuilding) (42 Days Prior Approval Notification Process)Ealing 262088PALHE · Prior Approval
May 2026 350 m away
Application Under Consideration
36, Minterne Avenue, UB2 4HPPart single and part two storey rear/side extension; rear roof extension involving alterations to the main roof profile; conversion of roof space into habitable space involving roof extension to side roof slope; alterations to the front and side elevations involving modifications and insertion of windows; changes to fenestration at first floor level including construction of Juliet balconies; andEaling 262062HH · Householder
May 2026 500 m away
PDV
46, Minterne Avenue, UB2 4HPAlteration of roof from hip to gable end; rear roof extension incorporating Juliet balcony (involving conversion of roofspace to habitable use); installation of two rooflights to front roofslope; construction of a single storey detached rear garden outbuilding for use as (gym/shower room /storage); and associated internal and external alterations (Lawful Development Certificate for a Proposed DeveEaling 262038CPL · All Other
May 2026 500 m away
Not Required
46, Minterne Avenue, UB2 4HPSingle storey (max 6.00m deep and max 3.00m high) rear extension (following demolition of existing single storey side and rear extension) (42 Days Prior Approval Notification Process)Ealing 262037PALHE · Prior Approval
May 2026 500 m away
PARG
46, Shaftesbury Avenue, UB2 4HJSingle storey (Max 6m deep and Max 3m high) rear extension (42 days Prior Notification Process)Ealing 261839PALHE · Prior Approval
May 2026 450 m away
Refused
23, Marlow Road, UB2 4NSSingle storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process)Ealing 261823PALHE · Prior Approval
May 2026 350 m away
Application Under Consideration
34, Marlow Road, UB2 4NSChange of use of single dwellinghouse (Use Class C3) into a 5-bedroom House in Multiple Occupation (HMO) (Use Class C4); rear roof extension; installation of two rooflights to front roofslope; single storey rear; associated internal alterations; and provision of cycle and refuse storage (Part retrospective and part proposed application)Ealing 261367FUL · All Other
19, Hunt Road, UB2 4PZSingle storey rear garden outbuilding for ancillary use as religious and gym roomEaling 261501HH · Householder
Apr 2026 100 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Swallowfield Way - Solar PanelsApproved, not yet built · 360 kW
Aug 2022 4.4 km away
Rooftop solar
Sergo Park Greenford Central, Phase 1A - Industrial, Warehouse & OfficesApproved, not yet built · 380 kW
Jan 2025 4.5 km away
Running nearest: Southall Lane Waste Depot (battery storage, 2.4 km); Western International Market (rooftop solar, 2.5 km); Western International Market (WIM) Site (battery storage, 2.5 km); Mogden STW (other, 4.8 km); Heathrow Airport Biomass CHP (biomass, 7.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Grosvenor Road, SouthallUtility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away
Minor
Park Avenue, SouthallUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
Immediate - urgent
Norwood Road, SouthallHighway improvement works · LONDON BOROUGH OF EALING · No carriageway incursion
Sept 2026 to Oct 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Waste Water Treatment Plants · Cross London Project
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.