What's changing near TW8 0SR
Within 2 km, around Kew Bridge & Gunnersbury Park in Hounslow. Building, planning, schools, transport, prices and crime.
1,310new homes completed within 2 km, last 2 years
627homes given permission on brownfield sites since 2021
+0.3%like-for-like prices in Kew Bridge & Gunnersbury Park, 2024 → 2025 (council +0.5%)
+7%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
17 new homes completedflats · Oct 2026
Oct 2026
1.9 km away - New homes
58 new homes completedflats · Aug 2025 – Sep 2026
Sept 2026
1.3 km away - New homes
42 new homes completedflats · Jan 2025 – Aug 2026
Aug 2026
1.3 km away - New homes
31 new homes completedflats · Mar 2026 – May 2026
May 2026
1.3 km away - New homes
9 new homes completed8 flats, 1 houses · May 2026
May 2026
1.5 km away - New homes
9 new homes completedflats · May 2026
May 2026
1.6 km away - New homes
27 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026
1.3 km away - New homes
52 new homes completedflats · Feb 2026
Feb 2026
200 m away - New homes
55 new homes completedflats · Feb 2026
Feb 2026
200 m away - New homes
81 new homes completedflats · Apr 2025 – Jan 2026
Jan 2026
300 m away - New homes
6 new homes completedhouses · Oct 2025 – Dec 2025
Dec 2025
1.6 km away - New homes
44 new homes completedflats · Dec 2025
Dec 2025
1.7 km away - New homes
Planning applications within 500 m
50applications in the last 12 months
23approved · 8 refused
12still being decided
1,305net new homes in approved schemes since 2023
- Application Received
London Museum Of Water And Steam, Green Dragon Lane, TW8 0ENDetails of Condition 3 (samples of all materials) and Condition 4 (detailed drainage design) submitted pursuant to permission P/2025/2407 dated 21/10/2025 for Installation of new timber boards, metal floor plates, high metal railings, laminated glass, balustrades, electrical system conduits, laminated glass infill panels and roof hatch. Replacing all the existing windows, rainwater downpipes and uHounslow P/2026/2871 · All Other
Oct 2026
150 m away - Application Received
Houseboat My Sea Crest, The Hollows, TW8 0DZInstallation of piling to form Moorings for Sea Crest houseboatHounslow P/2026/2742 · All Other
Sept 2026
250 m away - Application Received
961, Big Yellow Chiswick , TW8 9FXMBNL HSW241 Big Yellow Chiswick 961 Great West Road Brentford TW8 9FXHounslow PA/2026/2702 · Prior Approval
Sept 2026
350 m away - Application Received
Flat Ground Floor, Wellesley Road, W4 3APErection of a single storey extension to ground floor flat with associated landscaping to rear garden following demolition of existing conservatory and rear annexHounslow P/2026/2110 · All Other
Sept 2026
300 m away - Application Received
Kew Bridge Distribution Centre, Lionel Road SouthChange of use of Unit 2A to Use Class B8 (Storage and Distribution), with 1 no. cycle parking space at ground floor level.Hounslow P/2026/2596 · All Other
Sept 2026
400 m away - Application Received
42, Stile Hall Gardens, W4 3BUConversion of the existing residential house to two self contained flats with associated cycle and refuse storage.
18homes extended 2021–2025, typically adding 28 m²
40since energy certificates began (2008)
0in TW8 0SR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
- Thames Water
South Ealing Road, W5into River Brent0 spills, 0 hours in 2025
1.3 km away - Thames Water
Kew Transfer Pumping Stationinto Tidal River Thames0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
78 planned, approved or being built and 4 running (8 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Brentford Works, Great West Road - MasterplanApproved, not yet built · 230 kW
Jun 2026
250 m away - Rooftop solar
Sainsburys Supermarkets, Essex Place - Solar PanelsApproved, not yet built · 300 kW
Jul 2025
1.6 km away - Rooftop solar
Devonhurst Place - Solar PanelsApproved, not yet built
May 2022
1.7 km away - Rooftop solar
University Of West London - SolarApproved, not yet built · 200 kW
Nov 2021
2.2 km away - Rooftop solar
Shield Drive Industrial Estate - Solar PanelsApproved, not yet built
Jun 2022
2.5 km away - Rooftop solar
West Cross Industrial Park Shield Drive - Solar PanelsApproved, not yet built · 440 kW
Oct 2023
2.6 km away - Rooftop solar
West Middlesex University Hospital,Twickenham Road - Solar PV PanelsApproved, not yet built
Jun 2026
3.1 km away - Rooftop solar
West Middlesex Hospital, Twickenham Road - Solar PanelsApproved, not yet built · 150 kW
Nov 2024
3.1 km away - Rooftop solar
West Thames College, London Road - Solar PanelsApproved, not yet built · 200 kW
Jun 2024
4.0 km away - Rooftop solar
Light House, Western Road - Solar PanelsApproved, not yet built · 430 kW
Aug 2024
4.3 km away
Road and street works within 1 km
5 permitted works running now or planned, 2 of them major.
- Major
Chiswick Roundabout, LondonOptional permit (no fee) e.g. for traffic management etc · TRANSPORT FOR LONDON (TFL) · No carriageway incursion
Mar 2026 to Oct 2026
450 m away - Major, planned
Cambridge Road South, LondonHighway improvement works · LONDON BOROUGH OF HOUNSLOW · Road closure
Dec 2026 to Dec 2026
600 m away - Standard
Wellesley Road, LondonNew service connection · THAMES WATER · Give and take
Oct 2026 to Oct 2026
300 m away - Minor
Capital Interchange Way, BrentfordRemedial works · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026
250 m away - Minor
Kew Bridge Road, BrentfordUtility repair and maintenance works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · No carriageway incursion
Oct 2026 to Oct 2026
250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2027
4.5 km away - Pre-applicationapplication due December 2027
11.6 km away - Decideddecided Sept 2014
12.4 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
12.9 km away - Pre-applicationapplication due March 2028
20.2 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
20.8 km away - Decided
Transport schemes within 20 km
- Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
5.0 km away - TransportMay 2022
8.3 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
9.7 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
10.1 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
11.1 km away
Refused58A, Waldeck Road, W4 3NPRemoval of Condition 8 (Resident Parking Permits) from Planning Permission P/2021/4479 approved 12/08/2022 for the 'Change of use from offices to five dwellings, erection of a roof extension with front roof windows, with associated amenity space, landscaping and cycle and refuse storage'.Hounslow P/2026/1591 · All Other
May 2026
350 m away Running nearest: Mogden STW (other, 4.6 km); Southall Lane Waste Depot (battery storage, 8.2 km); Western International Market (rooftop solar, 8.3 km); Western International Market (WIM) Site (battery storage, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.