What's changing near TW20 0QG
Within 2 km, around Englefield Green & University in Runnymede. Building, planning, schools, transport, prices and crime.
89new homes completed within 2 km, last 2 years
198homes given permission on brownfield sites since 2021
-1.0%like-for-like prices in Englefield Green & University, 2024 → 2025 (council -0.1%)
+3%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Jun 2026 – Oct 2026
Oct 2026
1.4 km away - New homes
7 new homes completedflats · Feb 2026
Feb 2026
1.9 km away - New homes
53 new homes completedflats · Jan 2026
Jan 2026
2.0 km away - Planning permissionOct 2025
1.9 km away - Planning permissionJul 2025
450 m away - Planning permissionMay 2025
600 m away - Planning permissionFeb 2024
800 m away - Planning permissionSept 2022
1.9 km away - Planning permission
15homes extended 2021–2025, typically adding 38 m²
45since energy certificates began (2008)
0in TW20 0QG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
31 planned, approved or being built and 10 running (53 MW between them). Those within 5 km are on the map above.
- Solar farm
Parkside, Wick Lane - Solar Photovoltaic PanelsApproved, not yet built · 250 kW
Feb 2025
1.1 km away - Rooftop solar
Russells Farm, Windsor Great Park - Solar panelsApproved, not yet built · 210 kW
Dec 2023
3.6 km away - Solar farm
Twynersh Meadows, Thorpe Road - Solar Park & Battery StoragePlanning application in · 6 MW
Jul 2025
5.9 km away - Battery storage
Twynersh Meadows, Thorpe Road - Solar Park & Battery StoragePlanning application in · 5 MW
Jul 2025
5.9 km away - Battery storage
London Road - Battery StoragePlanning application in
Mar 2022
6.1 km away - Rooftop solar
Waitrose, King Edward Court - Solar Panel ArrayApproved, not yet built · 410 kW
Dec 2024
6.2 km away - Rooftop solar
Charters School, Charters Road - Solar PanelsApproved, not yet built · 450 kW
Jun 2024
6.5 km away - Rooftop solar
Oakleaf Farm, Horton Road - Solar PanelsApproved, not yet built
Aug 2024
6.5 km away - Rooftop solar
Oakleaf Farm, Horton Road - Roof Mounted Solar PanelsApproved, not yet built
Aug 2024
6.5 km away - Rooftop solar
The Windsor Boys School, Maidenhead Road - Solar PanelsApproved, not yet built · 490 kW
Sept 2025
6.5 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major, planned
Middle Hill, Englefield GreenHighway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
750 m away - Major
Middle Hill, Englefield GreenHighway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
750 m away - Minor
London Road, EghamUtility asset works · VIRGIN MEDIA · Two-way signals
Oct 2026 to Oct 2026
900 m away - Minor
Egham Hill, EghamHighway repair and maintenance works · SURREY COUNTY COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
9.6 km away - Pre-applicationapplication due December 2027
9.9 km away - Decideddecided Nov 2023
10.9 km away - Decideddecided Sept 2016
13.6 km away - Decideddecided May 2022
15.0 km away - Pre-applicationapplication due March 2027
17.2 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wraysbury Landfill (solar farm, 3.2 km); Norlands Lane Landfill Site (landfill gas, 4.0 km); Chertsey Water Treatment Works (solar farm, 4.6 km); Norlands Lane Landfill Site (Extension) (landfill gas, 5.0 km); Trumps Farm Landfill Scheme (landfill gas, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.