What's changing near TW18 4BU
Within 2 km, around Staines Town in Spelthorne. Building, planning, schools, transport, prices and crime.
522new homes completed within 2 km, last 2 years
334homes given permission on brownfield sites since 2021
-1.7%like-for-like prices in Staines Town, 2024 → 2025 (council +1.5%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedflats · Sep 2026
Sept 2026
200 m away - New homes
89 new homes completedflats · Jul 2026
Aug 2026
550 m away - New homes
90 new homes completedflats · Jul 2026
Jul 2026
600 m away - New homes
6 new homes completedhouses · Jul 2026
Jul 2026
550 m away - New homes
51 new homes completed27 flats, 24 houses · Jul 2025 – May 2026
May 2026
1.8 km away - New homes
59 new homes completedflats · Dec 2024 – May 2026
May 2026
800 m away - New homes
71 new homes completedflats · Dec 2025 – Apr 2026
Apr 2026
500 m away - New homes
21 new homes completed11 flats, 10 houses · Nov 2024 – May 2025
May 2025
450 m away - New homes
94 new homes completedflats · Jan 2025
Feb 2025
750 m away - New homes
5 new homes completedflats · Jan 2025
Jan 2025
650 m away - New homes
9 new homes completedhouses · Nov 2024
Dec 2024
500 m away - Planning permission
10homes extended 2021–2025, typically adding 24 m²
17since energy certificates began (2008)
1in TW18 4BU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
40 planned, approved or being built and 12 running (56 MW between them). Those within 5 km are on the map above.
- Battery storage
London Road - Battery StoragePlanning application in
Mar 2022
1.7 km away - Battery storage
W R Sports Club, The Centre - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Feb 2024
2.6 km away - Rooftop solar
Oakleaf Farm, Horton Road - Solar PanelsApproved, not yet built
Aug 2024
3.2 km away - Rooftop solar
Oakleaf Farm, Horton Road - Roof Mounted Solar PanelsApproved, not yet built
Aug 2024
3.2 km away - Battery storage
Long Lane, Stanwell - Battery Energy StorageApproved, not yet built · 50 MW
Jul 2025
3.9 km away - Solar farm
Twynersh Meadows, Thorpe Road - Solar Park & Battery StoragePlanning application in · 6 MW
Jul 2025
4.3 km away - Battery storage
Twynersh Meadows, Thorpe Road - Solar Park & Battery StoragePlanning application in · 5 MW
Jul 2025
4.3 km away - Battery storage
Manor Farm, Poyle Road - Battery Energy StorageApproved, not yet built
Jun 2026
4.6 km away - Rooftop solar
DNATA City East, Bedfont Road - Roof Mounted Solar PV PanelsApproved, not yet built · 390 kW
Mar 2022
4.8 km away - Rooftop solar
Dnata City, East Bedfont Road - Solar PanelsApproved, not yet built · 480 kW
Sept 2023
4.8 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Chertsey Lane, Staines-Upon-ThamesWorks for Rail Purposes · NETWORK RAIL · Road closure
Jan 2027 to Jan 2027
400 m away - Major
Hythefield Avenue, EghamUtility asset works · CADENT GAS LIMITED · Give and take
Jun 2026 to Feb 2027
900 m away - Minor
Thames Street, Staines-Upon-ThamesHighway repair and maintenance works · SURREY COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026
350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due December 2027
6.0 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
6.6 km away - Decideddecided Nov 2023
12.7 km away - Pre-applicationapplication due March 2027
12.9 km away - Decideddecided May 2022
13.2 km away - Decideddecided Sept 2016
17.5 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Norlands Lane Landfill Site (landfill gas, 2.2 km); Norlands Lane Landfill Site (Extension) (landfill gas, 2.4 km); Wraysbury Landfill (solar farm, 2.5 km); Chertsey Water Treatment Works (solar farm, 4.7 km); Heathrow Airport Biomass CHP (biomass, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.