Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Rooftop solar
Dnata City, East Bedfont Road - Solar PanelsApproved, not yet built · 480 kW
Sept 2023 5.7 km away
Rooftop solar
DNATA City East, Bedfont Road - Roof Mounted Solar PV PanelsApproved, not yet built · 390 kW
Mar 2022 5.7 km away
Running nearest: Norlands Lane Landfill Site (Extension) (landfill gas, 600 m); Norlands Lane Landfill Site (landfill gas, 1.2 km); Chertsey Water Treatment Works (solar farm, 3.3 km); Wraysbury Landfill (solar farm, 4.2 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.