Country England and Wales › Region South East › Council Spelthorne › Neighbourhood Staines South West › Postcode TW18 2JA What's changing near TW18 2JA Within 2 km, around Staines South West in Spelthorne. Building, planning, schools, transport, prices and crime.
10 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.2% like-for-like prices in Staines South West, 2024 → 2025 (council +1.5%)
-17% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 80 m²
23 since energy certificates began (2008)
1 in TW18 2JA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 43 planned, approved or being built and 12 running (56 MW between them). Those within 5 km are on the map above.
Solar farm Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage Planning application in · 6 MW
Jul 2025 2.5 km away Battery storage Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage Planning application in · 5 MW
Jul 2025 2.5 km away Battery storage W R Sports Club, The Centre - Micro Energy Storage Facility Approved, not yet built · 200 kW
Feb 2024 2.6 km away Battery storage London Road - Battery Storage Planning application in
Mar 2022 2.6 km away Battery storage Addlestone Moor, Chertsey Road - Micro Energy Storage System Approved, not yet built · 200 kW
Jan 2026 3.9 km away Energy from waste Charlton Lane Eco Park (ACT) Being built · 4 MW
May 2015 4.4 km away Battery storage Sunbury Battery Energy Storage System - Battery Energy Storage System Approved, not yet built · 200 MW
Jan 2026 4.4 km away Battery storage Long Lane, Stanwell - Battery Energy Storage Approved, not yet built · 50 MW
Jul 2025 4.6 km away Rooftop solar Oakleaf Farm, Horton Road - Solar Panels Approved, not yet built
Aug 2024 5.0 km away Rooftop solar Oakleaf Farm, Horton Road - Roof Mounted Solar Panels Approved, not yet built
Aug 2024 5.0 km away Road and street works within 1 km 8 permitted works running now or planned, 7 of them major.
Major Garrick Close, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Dec 2026 550 m away Major Meadway Close, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jul 2026 to Nov 2026 800 m away Major, planned Aymer Drive, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026 900 m away Major Ruskin Road, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Give and take
Oct 2026 to Oct 2026 950 m away Major, planned Clyve Way, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026 950 m away Major, planned Weir Place, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026 950 m away Major, planned Peket Close, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026 1000 m away Minor Staines Road, Laleham Utility asset works · BT · Multi-way signals
Nov 2026 to Nov 2026 450 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Pre-application application due December 2027 7.1 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 8.1 km away Decided decided May 2022 11.0 km away Pre-application application due March 2027 12.6 km away Decided decided Nov 2023 14.8 km away Decided decided Sept 2016 19.1 km away Pre-application
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Norlands Lane Landfill Site (Extension) (landfill gas, 950 m); Norlands Lane Landfill Site (landfill gas, 1.8 km); Chertsey Water Treatment Works (solar farm, 3.7 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 4.4 km); Wraysbury Landfill (solar farm, 4.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.