Looking around…
Country England and Wales › Region South East › Council Spelthorne › Neighbourhood Staines Town › Postcode TW18 2DH What's changing near TW18 2DH Within 2 km, around Staines Town in Spelthorne. Building, planning, schools, transport, prices and crime.
474 new homes completed within 2 km, last 2 years
290 homes given permission on brownfield sites since 2021
-1.7% like-for-like prices in Staines Town, 2024 → 2025 (council +1.5%)
-9% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 9 new homes completed flats · Sep 2026
Sept 2026 750 m away New homes 89 new homes completed flats · Jul 2026
Aug 2026 800 m away New homes 90 new homes completed flats · Jul 2026
Jul 2026 700 m away New homes 6 new homes completed houses · Jul 2026
Jul 2026 750 m away New homes 59 new homes completed flats · Dec 2024 – May 2026
May 2026 700 m away New homes 71 new homes completed flats · Dec 2025 – Apr 2026
Apr 2026 800 m away New homes 21 new homes completed 11 flats, 10 houses · Nov 2024 – May 2025
May 2025 1.2 km away New homes 94 new homes completed flats · Jan 2025
Feb 2025 650 m away New homes 5 new homes completed flats · Jan 2025
Jan 2025 1.5 km away New homes 9 new homes completed houses · Nov 2024
Dec 2024 1.2 km away Planning permission Nov 2021 1.3 km away Planning permission 18 homes extended 2021–2025, typically adding 30 m²
27 since energy certificates began (2008)
2 in TW18 2DH itself
Extended certificate 2023 Extended certificate 2022 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 46 planned, approved or being built and 15 running (58 MW between them). Those within 5 km are on the map above.
Battery storage London Road - Battery Storage Planning application in
Mar 2022 1.1 km away Battery storage W R Sports Club, The Centre - Micro Energy Storage Facility Approved, not yet built · 200 kW
Feb 2024 1.7 km away Rooftop solar Oakleaf Farm, Horton Road - Solar Panels Approved, not yet built
Aug 2024 3.4 km away Rooftop solar Oakleaf Farm, Horton Road - Roof Mounted Solar Panels Approved, not yet built
Aug 2024 3.4 km away Battery storage Long Lane, Stanwell - Battery Energy Storage Approved, not yet built · 50 MW
Jul 2025 3.4 km away Solar farm Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage Planning application in · 6 MW
Jul 2025 4.0 km away Battery storage Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage Planning application in · 5 MW
Jul 2025 4.0 km away Rooftop solar Dnata City, East Bedfont Road - Solar Panels Approved, not yet built · 480 kW
Sept 2023 4.2 km away Rooftop solar DNATA City East, Bedfont Road - Roof Mounted Solar PV Panels Approved, not yet built · 390 kW
Mar 2022 4.2 km away Rooftop solar Skyline Business Park, Great South West Road - Solar Panels Approved, not yet built · 390 kW
Jan 2023 4.9 km away Road and street works within 1 km 10 permitted works running now or planned, 5 of them major.
Major Priory Green, Staines-Upon-Thames Highway repair and maintenance works · SURREY COUNTY COUNCIL · Two-way signals
Sept 2026 to Nov 2026 450 m away Major Jamnagar Close, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 650 m away Major Ruskin Road, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Give and take
Oct 2026 to Oct 2026 750 m away Major, planned Chertsey Lane, Staines-Upon-Thames Works for Rail Purposes · NETWORK RAIL · Road closure
Jan 2027 to Jan 2027 800 m away Major Meadway Close, Staines-Upon-Thames Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jul 2026 to Nov 2026 900 m away Minor Thames Street, Staines-Upon-Thames Highway repair and maintenance works · SURREY COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 600 m away Minor Kingston Road, Staines-Upon-Thames Highway repair and maintenance works · SURREY COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 600 m away Minor Staines By-Pass, Staines-Upon-Thames Works for road purposes · NATIONAL HIGHWAYS · Lane closure
Oct 2026 to Oct 2026 700 m away Minor London Road, Staines-Upon-Thames Works for road purposes · NATIONAL HIGHWAYS · Lane closure
Oct 2026 to Oct 2026 700 m away Major infrastructure projects within 30 km Pre-application application due December 2027 5.7 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 6.6 km away Pre-application application due March 2027 12.1 km away Decided decided May 2022 12.6 km away Decided decided Nov 2023 13.5 km away Decided decided Sept 2016 18.4 km away Pre-application
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Unit 2, Lotus Park, Staines-upon-Thames (other)
Nov 2021 1.3 km away
Planning permission May 2021 1.7 km away Planning permission Feb 2021 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 28 postcodes nearby had new homes completed in the last two years.
Rooftop solar Skyline Business Park, Great South West Road - Solar Panels Approved, not yet built · 440 kW
Jan 2023 4.9 km away Rooftop solar Skyline Business Park, Great South West Road - Solar Panels Approved, not yet built · 250 kW
Dec 2024 4.9 km away Running nearest: Norlands Lane Landfill Site (Extension) (landfill gas, 2.2 km); Norlands Lane Landfill Site (landfill gas, 2.4 km); Wraysbury Landfill (solar farm, 3.4 km); Heathrow Airport Biomass CHP (biomass, 4.4 km); Chertsey Water Treatment Works (solar farm, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Kingston Road, Staines-Upon-Thames Highway repair and maintenance works · SURREY COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
application due January 2027 18.6 km away
Decided decided Sept 2014 28.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.