What's changing near TW15 3EU
Within 2 km, around Ashford West in Spelthorne. Building, planning, schools, transport, prices and crime.
61new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.2%like-for-like prices in Ashford West, 2024 → 2025 (council +1.5%)
-6%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completed2 flats, 3 houses · Jun 2025
Jun 2025
1.9 km away - New homes
26 new homes completedflats · Mar 2025
Mar 2025
1000 m away - New homes
14 new homes completedflats · Jan 2025
Jan 2025
800 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 33 m²
27since energy certificates began (2008)
1in TW15 3EU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
47 planned, approved or being built and 16 running (64 MW between them). Those within 5 km are on the map above.
- Battery storage
W R Sports Club, The Centre - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Feb 2024
950 m away - Battery storage
Long Lane, Stanwell - Battery Energy StorageApproved, not yet built · 50 MW
Jul 2025
1.1 km away - Battery storage
London Road - Battery StoragePlanning application in
Mar 2022
1.6 km away - Rooftop solar
Dnata City, East Bedfont Road - Solar PanelsApproved, not yet built · 480 kW
Sept 2023
1.8 km away - Rooftop solar
DNATA City East, Bedfont Road - Roof Mounted Solar PV PanelsApproved, not yet built · 390 kW
Mar 2022
1.8 km away - Rooftop solar
Skyline Business Park, Great South West Road - Solar PanelsApproved, not yet built · 390 kW
Jan 2023
2.4 km away - Rooftop solar
Skyline Business Park, Great South West Road - Solar PanelsApproved, not yet built · 440 kW
Jan 2023
2.4 km away - Rooftop solar
Skyline Business Park, Great South West Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2024
2.4 km away - Rooftop solar
Oakleaf Farm, Horton Road - Solar PanelsApproved, not yet built
Aug 2024
2.9 km away - Rooftop solar
Oakleaf Farm, Horton Road - Roof Mounted Solar PanelsApproved, not yet built
Aug 20242.9 km away
Road and street works within 1 km
7 permitted works running now or planned, 1 of them major.
- Major, planned
Stanwell Road, AshfordHighway improvement works · SURREY COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
450 m away - Standard
Stanwell Road, AshfordOptional permit (no fee) e.g. for traffic management etc · NATIONAL HIGHWAYS · Lane closure
Feb 2027 to Feb 2027
200 m away - Standard
Stanwell Road, AshfordOptional permit (no fee) e.g. for traffic management etc · NATIONAL HIGHWAYS · Lane closure
Feb 2027 to Feb 2027
250 m away - Standard
Town Lane, StanwellOptional permit (no fee) e.g. for traffic management etc · NATIONAL HIGHWAYS · Lane closure
Feb 2027 to Feb 2027
300 m away - Standard
Stanwell Road, AshfordHighway improvement works · SURREY COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
450 m away - Standard
Rennie Close, AshfordNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away - Minor
Long Lane, StanwellHighway repair and maintenance works · SURREY COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due December 2027
3.6 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
5.0 km away - Pre-applicationapplication due March 2027
9.6 km away - Decideddecided May 2022
13.4 km away - Decideddecided Nov 2023
14.2 km away - Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
Transport schemes within 20 km
Running nearest: Heathrow Airport Biomass CHP (biomass, 2.1 km); Norlands Lane Landfill Site (Extension) (landfill gas, 4.5 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 4.6 km); Norlands Lane Landfill Site (landfill gas, 4.9 km); Wraysbury Landfill (solar farm, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.