What's changing near TW15 1LU
Within 2 km, around Ashford Common in Spelthorne. Building, planning, schools, transport, prices and crime.
50new homes completed within 2 km, last 2 years
11homes given permission on brownfield sites since 2021
+1.6%like-for-like prices in Ashford Common, 2024 → 2025 (council +1.5%)
+8%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
26 new homes completedflats · Mar 2025
Mar 2025
1.7 km away - New homes
10 new homes completed8 flats, 2 houses · Dec 2024
Dec 2024
1.6 km away - Planning permission
Permission for 11 homesGarage Blocks behind, 17, Ashford Road (full planning permission)
Jul 2021
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
54homes extended 2021–2025, typically adding 29 m²
86since energy certificates began (2008)
0in TW15 1LU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
49 planned, approved or being built and 14 running (58 MW between them). Those within 5 km are on the map above.
- Battery storage
Sunbury Battery Energy Storage System - Battery Energy Storage SystemApproved, not yet built · 200 MW
Jan 2026
2.0 km away - Energy from waste
Charlton Lane Eco Park (ACT)Being built · 4 MW
May 2015
2.5 km away - Battery storage
W R Sports Club, The Centre - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Feb 2024
2.7 km away - Rooftop solar
Skyline Business Park, Great South West Road - Solar PanelsApproved, not yet built · 390 kW
Jan 2023
3.1 km away - Rooftop solar
Skyline Business Park, Great South West Road - Solar PanelsApproved, not yet built · 440 kW
Jan 2023
3.1 km away - Rooftop solar
Skyline Business Park, Great South West Road - Solar PanelsApproved, not yet built · 250 kW
Dec 2024
3.1 km away - Battery storage
Long Lane, Stanwell - Battery Energy StorageApproved, not yet built · 50 MW
Jul 2025
3.1 km away - Rooftop solar
Dnata City, East Bedfont Road - Solar PanelsApproved, not yet built · 480 kW
Sept 2023
3.2 km away - Rooftop solar
DNATA City East, Bedfont Road - Roof Mounted Solar PV PanelsApproved, not yet built · 390 kW
Mar 2022
3.2 km away - Battery storage
London Road - Battery StoragePlanning application in
Mar 20223.8 km away
Road and street works within 1 km
6 permitted works running now or planned, 4 of them major.
- Major, planned
Metcalf Road, AshfordUtility repair and maintenance works · AFFINITY WATER - C · Road closure
Mar 2027 to Mar 2027
550 m away - Major
Sandells Avenue, AshfordNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Sept 2026 to Oct 2026
650 m away - Major
Feltham Road, AshfordHighway repair and maintenance works · SURREY COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
700 m away - Major
Staines Road West, AshfordHighway improvement works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
850 m away - Minor
Chertsey Road, AshfordUtility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Chertsey Road, AshfordUtility repair and maintenance works · AFFINITY WATER - C · Two-way signals
Oct 2026 to Oct 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due December 2027
5.1 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
7.0 km away - Pre-applicationapplication due March 2027
8.3 km away - Decideddecided May 2022
11.7 km away - Decideddecided Nov 2023
16.8 km away - Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
Transport schemes within 20 km
Running nearest: Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 2.5 km); Heathrow Airport Biomass CHP (biomass, 3.8 km); Walton WTW PV (solar farm, 4.0 km); Hurst Road - Walton Solar PV Farm (solar farm, 4.1 km); Norlands Lane Landfill Site (Extension) (landfill gas, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.