94new homes completed within 2 km, last 2 years
469homes given permission on brownfield sites since 2021
+4.7%like-for-like prices in Feltham East, 2024 → 2025 (council +0.5%)
-6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedhouses · Aug 2026 – Oct 2026
Oct 2026
1.9 km away - New homes
9 new homes completedflats · Jun 2026
Jun 2026
500 m away - Planning permission
Permission for 3 homesLand adjacent to 82-96 Oxford Court, Oxford Way, Hanworth, Feltham, TW13 6RZ (full planning permission) Oct 2025
1.7 km away - New homes
5 new homes completedflats · Jul 2025
Jul 2025
1.5 km away - New homes
5 new homes completed3 flats, 2 houses · Apr 2025
Apr 2025
850 m away - Planning permission
Permission for 6 homesMr Lemon Carwash, Spring Corner, High St, Feltham TW13 4PA (P/2023/2376) (full planning permission) Apr 2025
1.5 km away - New homes
7 new homes completedflats · Mar 2025
Mar 2025
1.2 km away - New homes
35 new homes completedflats · Mar 2025
Mar 2025
1.1 km away - New homes
6 new homes completedhouses · Dec 2024
Dec 2024
1.2 km away - Planning permission
Planning applications within 500 m
32applications in the last 12 months
22approved · 6 refused
4still being decided
3net new homes in approved schemes since 2023
- Application Received
68, Hanworth Road, TW13 5AYDemolition of the existing rear conservatory and detached side garage; erection of a two-storey side extension and a single-storey rear extension; loft conversion with rear dormers to the main roof and rear outrigger and two rooflights to the front roof slope; alterations to fenestration including high-level side windows and rooflights; and internal reconfiguration.Hounslow P/2026/2817 · Householder
Oct 2026
150 m away - Application Received
128, Durham Road, TW14 0AEConstruction of outbuilding involving the demolition of existing shedsHounslow P/2026/2804 · Householder
Oct 2026
400 m away - Application Received
7, Hanworth Road, TW13 5AFNon material amendment to allow the installation of a window to the north east elevation, incorporating frosted/obscure glazing of planning permission P/2025/2404 approved 31/07/2026 for the erection of a detached outbuilding in the rear garden to be used as a classroom.Hounslow P/2026/2390 · All Other
Sept 2026
400 m away - Application Received
Springwest Academy, Browells Lane, TW13 7EFErection of a two storey special educational needs building with associated sensory garden, landscaping, cycle and refuse storage.Hounslow P/2026/2293 · All Other
Aug 2026
350 m away - Approved
76, Hanworth Road, TW13 5AYErection of a two storey side extension, first floor rear extension, single storey rear extensionHounslow P/2026/1282 · Householder
Aug 2026
150 m away - Refused
49, Durham Road, TW14 0AGCertificate of lawfulness for the proposed erection of a detached outbuilding in the rear garden.
28homes extended 2021–2025, typically adding 21 m²
37since energy certificates began (2008)
2in TW13 5BN itself
- Extendedcertificate 2026
- Extendedcertificate 2025
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
52 planned, approved or being built and 14 running (63 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Heathrow Gateway - Solar PanelsApproved, not yet built · 240 kW
Nov 2023
1.3 km away - Rooftop solar
Hampton Business Park, Bolney Way- Solar PanelsApproved, not yet built · 210 kW
Oct 2022
1.5 km away - Rooftop solar
Falcon House, Central Way - Photovoltaic Solar PanelsApproved, not yet built · 250 kW
Sept 2023
1.6 km away - Rooftop solar
Spur Road - Solar PanelsApproved, not yet built · 270 kW
Aug 2023
1.8 km away - Rooftop solar
Geodis, Faggs Road - Solar PanelsApproved, not yet built · 840 kW
Aug 2022
2.1 km away - Rooftop solar
Sainsburys Supermarkets, Uxbridge Road - Solar PV PanelsApproved, not yet built · 290 kW
Apr 2025
2.4 km away - Rooftop solar
Hatton Cross Underground Station, Southern Perimeter Road -Solar PanelsApproved, not yet built · 260 kW
Jan 2025
2.7 km away - Rooftop solar
Big Yellow Self Storage, Staines Road - Solar PanelsPlanning application in · 180 kW
Aug 2023
2.9 km away - Rooftop solar
Skyline Business Park, Great South West Road - Solar PanelsApproved, not yet built · 390 kW
Jan 2023
3.1 km away - Rooftop solar
Skyline Business Park, Great South West Road - Solar PanelsApproved, not yet built · 440 kW
Jan 20233.1 km away
Road and street works within 1 km
6 permitted works running now or planned.
- Standard
Victoria Road, FelthamUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026
550 m away - Standard
High Street, FelthamUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026
600 m away - Minor
Florence Road, FelthamRemedial works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Oct 2026
350 m away - Minor
Cambria Court, FelthamRemedial works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Nov 2026
550 m away - Minor
Forest Road, FelthamUtility asset works · AFFINITY WATER - C · Multi-way signals
Oct 2026 to Oct 2026
550 m away - Minor
Highfield Road, FelthamUtility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due December 2027
4.6 km away - Pre-applicationapplication due March 2027
4.8 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
6.8 km away - Decideddecided May 2022
14.3 km away - Decideddecided Nov 2023
17.8 km away - Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
Transport schemes within 20 km
- Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
13.8 km away - TransportMay 2022
17.4 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
18.1 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
18.3 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
19.2 km away
Running nearest: Heathrow Airport Biomass CHP (biomass, 4.3 km); Mogden STW (other, 4.6 km); Walton WTW PV (solar farm, 4.8 km); Hurst Road - Walton Solar PV Farm (solar farm, 5.0 km); Southall Lane Waste Depot (battery storage, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.