Looking around…
What's changing near TW12 2RD
Within 2 km, around Hampton Village in Richmond upon Thames. Building, planning, schools, transport, prices and crime.
48new homes completed within 2 km, last 2 years
40homes given permission on brownfield sites since 2021
+1.6%like-for-like prices in Hampton Village, 2024 → 2025 (council +0.4%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
Planning applications within 500 m
43applications in the last 12 months
24approved · 0 refused
14still being decided
1net new homes in approved schemes since 2023
- Application Under Consideration
1, Walker Close, TW12 3XTNon material amendment to planning reference PA26/2187 to allow to change the extension front door from anthracite outer frame and door slab to a white outer frame with a grey door slab. The window on the front of the extension is to be changes from anthracite grey outside to white outside. The roof slates are to be changed from black to dark grey.Richmond PA26/3238 · All Other
Sept 2026
450 m away - Application Under Consideration
144, Broad Lane, TW12 3BWSINGLE STOREY REAR EXTENSION (5m depth, 2.6m eaves height, 3.6m overall height)Richmond PA26/3102 · All Other
Sept 2026
150 m away - Application Under Consideration
23, Manderlea, The Avenue, TW12 3RNSingle storey rear extension, single storey side extension, and the installation of an air conditioning unitRichmond PA26/3057 · Householder
Sept 2026
300 m away - Approved
144, Broad Lane, TW12 3BWPROPOSED SINGLE STOREY SIDE EXTENSION. PROPOSED LOFT ADDITIONRichmond PA26/2978 · All Other
Aug 2026
150 m away - Application Under Consideration
120, Percy Road, TW12 2JWPROPOSED SINGLE STOREY REAR/SIDE WRAP AROUND EXTENSION.Richmond PA26/2907 · Householder
Aug 2026
300 m away - Application Under Consideration
34, Lawrence Road, TW12 2RJHip to gable rear dormer loft conversion, installation of two front roof lights and one new gable end window.Richmond PA26/2875 · All Other
Aug 2026
250 m away - Approved
56homes extended 2021–2025, typically adding 42 m²
97since energy certificates began (2008)
3in TW12 2RD itself
- Extendedcertificate 2025
- Extendedcertificate 2018
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
48 planned, approved or being built and 10 running (24 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sainsburys Supermarkets, Uxbridge Road - Solar PV PanelsApproved, not yet built · 290 kW
Apr 2025
1.5 km away - Rooftop solar
Hampton Business Park, Bolney Way- Solar PanelsApproved, not yet built · 210 kW
Oct 2022
2.1 km away - Rooftop solar
Big Yellow Self Storage, Central Avenue - Solar PanelsApproved, not yet built · 200 kW
Jul 2025
2.6 km away - Rooftop solar
Heathrow Gateway - Solar PanelsApproved, not yet built · 240 kW
Nov 2023
3.4 km away - Battery storage
Rydens Road - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026
4.3 km away - Rooftop solar
Kneller Hall SchoolBeing built · 250 kW
Dec 2025
4.3 km away - Battery storage
Sunbury Battery Energy Storage System - Battery Energy Storage SystemApproved, not yet built · 200 MW
Jan 2026
4.4 km away - Energy from waste
Charlton Lane Eco Park (ACT)Being built · 4 MW
May 2015
4.7 km away - Rooftop solar
Twickenham Trading Estate, Rugby Road - Solar PanelsApproved, not yet built · 160 kW
Sept 2024
4.8 km away - Rooftop solar
Ham Close - 452 Houses, Flats & Leisure CentreBeing built · 430 kW
Oct 2023
4.8 km away - Rooftop solar
Road and street works within 1 km
14 permitted works running now or planned, 9 of them major.
- Major
Cambridge Road, HamptonRemedial works · THAMES WATER · Road closure
Oct 2026 to Oct 2026
100 m away - Major
The Avenue, HamptonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Two-way signals
Oct 2026 to Oct 2026
350 m away - Major
Oak Avenue, HamptonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Nov 2026
650 m away - Major
Fearnley Crescent, HamptonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 2026
650 m away - Major
Percy Road, HamptonOptional permit (no fee) e.g. for traffic management etc · LONDON BOROUGH OF RICHMOND UPON THAMES · Road closure
Nov 2026 to Nov 2026
800 m away - Major
Birchwood Grove, HamptonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 2026
800 m away - Major
Springfield Avenue, HamptonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 2026
900 m away - Major
Carlisle Road, HamptonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 2026
950 m away - Major
Scotts Drive, HamptonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 20261000 m away
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2027
5.5 km away - Pre-applicationapplication due December 2027
7.6 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
9.9 km away - Decideddecided May 2022
12.1 km away - Decideddecided Nov 2023
20.6 km away - Decideddecided Sept 2014
20.9 km away - Pre-application
Transport schemes within 20 km
- Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
14.9 km away - TransportMay 2022
17.6 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
17.6 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
18.6 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
19.4 km away
67 - 71 High Street, Hampton Hill, Hampton TW12 1NH (other)
Jun 2022
1.5 km away
Planning permissionPermission for 6 homesOxford Way 50-64 - Hounslow '5000 Pledge', GARAGE BLOCK ADJACENT 50 TO 64, OXFORD COURT, OXFORD WAY (full planning permission)
Mar 2022
1.6 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
30, Westbrook Avenue, TW12 2RE
Loft Extension involving Construction of rear dormer and installation of 2 Skylights on the front roof slope.
Richmond PA26/2815 · All Other
Aug 2026
100 m away
Approved30, Houghton, Oak Avenue, TW12 3NXOak – Current crown spread approximately 12 metres. Reduce lateral branches on the property/house side by approximately 0.3 metres and lateral branches on the road side by approximately 0.3 metres, pruning back to suitable growth points. This would result in an approximate final crown spread of 11.4 metres and represents a minimal reduction of approximately 5% in overall crown spread. Remove epicoRichmond PA26/2800 · All Other
Aug 2026
400 m away Application Under ConsiderationLyndhurst, Marlborough Road, TW12 3RXDemolition of the existing building; Erection of replacement 5-bedroom dwelling with associated hard and soft landscaping.Richmond PA26/2597 · All Other · 1 homes proposed
Aug 2026
500 m away Approved30, Westbrook Avenue, TW12 2REConstruction of single storey rear extension, 6m in depth, 3.33m in height, and 2.3m in height to eaves, following demolition of existing single storey rear extension.Richmond PA26/2515 · All Other
Jul 2026
100 m away Approved141, Broad Lane, TW12 3BXSingle storey rear extensionRichmond PA26/2414 · Householder
Jul 2026
150 m away Closed2, Hatherop Road, TW12 2RHDemolish existing conservatory and construct single storey side and rear extensionRichmond PA26/2338 · Householder
Jul 2026
250 m away Approved1, Walker Close, TW12 3XTSingle storey extension to front elevation.Richmond PA26/2187 · Householder
Jun 2026
450 m away Approved22, Ripley Road, TW12 2JHDouble hip to gable and rear dormer roof extensions, installation of front roof lights and chimney removal.Richmond PA26/2009 · Householder
Jun 2026
350 m away Approved16, Wembley Road, TW12 2QETwo storey and single storey rear extensionRichmond PA26/1685 · Householder
May 2026
450 m away Application Under Consideration38, Ripley Road, TW12 2JHRaising of existing side flat roof.Richmond PA26/1372 · Householder
May 2026
300 m away Application Under Consideration3, Coombe Road, TW12 3PBInstallation of EV charger on outside wall. On street parking and footway channel already approved for installation (ref 819447402).Richmond PA26/1606 · Householder
May 2026
250 m away Application Under Consideration5, Orchard Road, TW12 2JJ5 Orchard RoadRichmond PA26/1409 · All Other
Apr 2026
200 m away Application Under Consideration149, Percy Road, TW12 2JPLoftRichmond PA26/1321 · All Other
Apr 2026
250 m away Application Under Consideration47, Sonning Gardens, TW12 3PNLawful Dev. Cert. 47Richmond PA26/0938 · All Other
Apr 2026
400 m away Application Under Consideration54, Hatherop Road, TW12 2RFThe proposed works involve modifications to the existing dormer window located above the bathroom on the first floor at the rear of the property. The key changes include: 1. Enlargement of Dormer Window: The existing dormer window will be extended to provide improved natural light and ventilation to the bathroom. 2. Alteration of Roof Structure: Adjustments to the roof structure will be made to acRichmond 25/0071/HOT · Householder
Apr 2026
150 m away Approved154, Broad Lane, TW12 3BWDetails pursuant to conditions nos: U0172823 (Refuse arrangements), U0172824 (Cycle parking), U0172825 (Boundary Treatment), U0172827 - Part 1 (Site Monitoring), U0172828 (Hard and Soft Landscaping Details) of planning permission ref: 22/3228/FUL dated 15 January 2024.Richmond PA26/1185 · All Other
Apr 2026
150 m away Insufficient Fee40, Courtlands Avenue, TW12 3NTRemoval of existing roof and rear extension; Raising of main roof; Construction of a part two-storey part single storey rear extension; Construction of a single storey side extension; and Construction of new roof with 2.no of rear dormers and 1 no. of side dormer to the east.Richmond PA26/1155 · Householder
Mar 2026
250 m away Application Under Consideration111, Percy Road, TW12 2JSSIDE GARAGE CONVERSION INTO HABITABLE ROOM, SINGLE STOREY REAR EXTENSION, PART DOUBLE STOREY SIDE EXTENSION AND LOFT CONVERSIONRichmond PA25/4522 · Householder
Mar 2026
350 m away Approved58, Hatherop Road, TW12 2RFProposed single-storey rear extensionRichmond PA26/0861 · Prior Approval
Mar 2026
150 m away Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Falcon House, Central Way - Photovoltaic Solar PanelsApproved, not yet built · 250 kW
Sept 2023
4.8 km away
Rooftop solarSpur Road - Solar PanelsApproved, not yet built · 270 kW
Aug 2023
5.0 km away Running nearest: Walton WTW PV (solar farm, 2.3 km); Hurst Road - Walton Solar PV Farm (solar farm, 2.5 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 4.7 km); Mogden STW (other, 5.5 km); London’s Queen Elizabeth II reservoir (solar farm, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
MinorFalcon Road, HamptonUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
50 m away MinorPriory Gardens, HamptonRemedial works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
350 m away MinorByatt Walk, HamptonUtility asset works · THAMES WATER · Some carriageway incursion
Dec 2026 to Dec 2026
550 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
application due January 2027
23.7 km away
Decideddecided Sept 2016
26.9 km away Pre-applicationapplication due March 2028
27.4 km away DecidedSilvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
28.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.