What's changing near TS8 9RE
Within 2 km, around Stainton & Hemlington in Middlesbrough. Building, planning, schools, transport, prices and crime.
89new homes completed within 2 km, last 2 years
139homes given permission on brownfield sites since 2021
+3.8%like-for-like prices in Stainton & Hemlington, 2024 → 2025 (council +4.3%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedhouses · Jun 2026 – Oct 2026
Oct 2026
1.7 km away - New homes
53 new homes completedhouses · Oct 2024 – Apr 2026
Apr 2026
1.4 km away - New homes
23 new homes completedhouses · Apr 2025 – Sep 2025
Sept 2025
1.5 km away - Planning permissionAug 2024
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 30 m²
24since energy certificates began (2008)
2in TS8 9RE itself
- Extendedcertificate 2021
- Extendedcertificate 2009
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
32 planned, approved or being built and 13 running (116 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Viewley Hill Academy, Andover Way - Solar Pv PanelsApproved, not yet built · 170 kW
Nov 2023
1.0 km away - Rooftop solar
Rainbow Leisure Centre, Dalby Way - Solar PanelsApproved, not yet built · 340 kW
Dec 2024
2.3 km away - Battery storage
The North West & South East Sides Of The A19 - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 2025
3.3 km away - Rooftop solar
Hollywood Bowl, Aintree Oval - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Dec 2024
4.2 km away - Battery storage
Bowesfield Flexible Energy ParkApproved, not yet built · 8 MW
Oct 2021
4.5 km away - Rooftop solar
Endeavour House - Solar PanelsApproved, not yet built · 160 kW
Oct 2024
4.9 km away - Rooftop solar
David Lloyd Club, Tees Barrage Way - Solar PanelsApproved, not yet built · 460 kW
Nov 2023
5.2 km away - Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024
5.4 km away - Rooftop solar
Armadillo Self Storage, North Tees Industrial Estate - Solar PanelsApproved, not yet built · 150 kW
May 2025
5.6 km away - Rooftop solar
Dunedin House,Columbia Drive - Solar PanelsApproved, not yet built · 260 kW
Dec 20235.6 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
- Major, planned
Cobblestone Close, MiddlesbroughUtility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026
600 m away - Major
Cobblestone Close, MiddlesbroughUtility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026
600 m away - Major
Cedarwood Glade, MiddlesbroughUtility repair and maintenance works · BT · Road closure
Oct 2026 to Oct 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
9.9 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
10.2 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
10.8 km away - Decideddecided Jul 2016
12.2 km away - Decideddecided Feb 2024
13.5 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Seamer Wind Farm - Hambleton (wind farm, 3.3 km); Seamer Windfarm - Stockton on Tees (wind farm, 3.4 km); Lambs Hill (wind farm, 5.3 km); Albert Road Rooftop Solar Panels (rooftop solar, 5.6 km); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 6.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.