Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
23hours of spills in 2025 between them (typical neighbourhood: about 36)
Wilton International, Teesside - Green Hydrogen PlantApproved, not yet built · 8 MW
Oct 2025 3.4 km away
Battery storage
Tesside GigaPark - Battery Energy Storage SystemPlanning application in · 1,000 MW
May 20263.4 km away
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
Major
Lodge Road, EstonSection 50 · REDCAR AND CLEVELAND BOROUGH COUNCIL · Priority working
Sept 2026 to Oct 2026 200 m away
Minor
Richmond Close, EstonOptional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026 500 m away
Minor
High Street, NormanbyUtility asset works · NORTHUMBRIAN WATER · Multi-way signals
Oct 2026 to Oct 2026 650 m away
Minor
West Street, NormanbyUtility asset works · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
decided Apr 2019 2.2 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
The Net Zero Teesside ProjectGenerating Stations · Land at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QW
decided Feb 2024 6.8 km away
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
Solar farm
Roman Terrace - Solar FarmApproved, not yet built
Jul 2025 3.5 km away
Solar farm
PD Teesport Warehouse A, Bulk Tees - Solar PanelsApproved, not yet built · 1 MW
Jul 2025 4.8 km away
Running nearest: Wilton International (biomass, 3.3 km); Wilton 11 EfW (energy from waste, 3.3 km); Imperial Park (anaerobic digestion, 3.6 km); ICI No2 (Teesport) Landfill (landfill gas, 3.7 km); Land at Woodhouse Farm (solar farm, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Other Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.