What's changing near TS6 8EF
Within 2 km, around Eston in Redcar and Cleveland. Building, planning, schools, transport, prices and crime.
0new homes completed within 2 km, last 2 years
9homes given permission on brownfield sites since 2021
+4.7%like-for-like prices in Eston, 2024 → 2025 (council +4.0%)
-11%recorded crime, last 12 months vs the 12 before
On the map
Planning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionSept 2021
1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 26 m²
5since energy certificates began (2008)
1in TS6 8EF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
32hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
- Northumbrian Water
Pasture Lane Csointo Unnamed Trib Of Dabholme Beck10 spills, 22 hours in 2025
300 m away - Northumbrian Water
Queen Street Allottments Csointo Unnamed Trib Of Dabholme Beck13 spills, 9 hours in 2025
300 m away - Northumbrian Water
Greystone Rd Ssointo Kettle Beck0 spills, 0 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 11 running (171 MW between them). Those within 5 km are on the map above.
- Battery storage
Greystones Road, Grangetown - Battery Energy Storage SystemApproved, not yet built · 60 MW
Dec 2021
900 m away - Battery storage
Wilton International, Greystones Road - Phase 1Approved, not yet built · 150 MW
Oct 2023
900 m away - Battery storage
Old Hall Farm, Lackenby - BESSPlanning application in · 244 MW
Aug 2025
1000 m away - Energy from waste
Wilton Waste Treatment Plant - Waste to Energy PlantApproved, not yet built
Jan 2026
1.1 km away - Hydrogen
Wilton Industrial, Plot 1C - Electrolytic Hydrogen FacilityPlanning application in · 60 MW
Oct 2025
1.1 km away - Hydrogen
Wilton International, Teesside - Green Hydrogen PlantApproved, not yet built · 8 MW
Oct 2025
1.5 km away - Battery storage
Tesside GigaPark - Battery Energy Storage SystemPlanning application in · 1,000 MW
May 2026
1.5 km away - Rooftop solar
CSG Limited, Holden Close - Solar PanelsApproved, not yet built · 230 kW
Mar 2023
2.9 km away - Energy from waste
Grangetown Prairie - Energy Recovery Facility, Option 1Approved, not yet built · 36 MW
Jul 2023
2.9 km away - Rooftop solar
Elring Klinger, Troisdorf Way - Solar PV PanelsApproved, not yet built · 410 kW
Nov 20243.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
950 m away - Decideddecided Feb 2024
5.4 km away - Decideddecided Jul 2016
5.6 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
5.8 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
7.3 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wilton International (biomass, 1.3 km); Wilton 11 EfW (energy from waste, 1.3 km); ICI No2 (Teesport) Landfill (landfill gas, 3.6 km); Imperial Park (anaerobic digestion, 4.6 km); Land at Woodhouse Farm (solar farm, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.