What's changing near TS6 0AH
Within 2 km, around South Bank & Teesville in Redcar and Cleveland. Building, planning, schools, transport, prices and crime.
311new homes completed within 2 km, last 2 years
297homes given permission on brownfield sites since 2021
+6.0%like-for-like prices in South Bank & Teesville, 2024 → 2025 (council +4.0%)
+15%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
27 new homes completedhouses · Feb 2026 – Oct 2026
Oct 2026
1.2 km away - New homes
45 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
1.3 km away - New homes
22 new homes completedhouses · Jan 2026 – Oct 2026
Oct 2026
1.3 km away - New homes
9 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.2 km away - New homes
5 new homes completedhouses · May 2026
May 2026
1.7 km away - New homes
20 new homes completedhouses · Oct 2025 – Feb 2026
Feb 2026
1.2 km away - New homes
22 new homes completedhouses · Nov 2024 – Jan 2026
Jan 2026
1.1 km away - New homes
27 new homes completedhouses · May 2025 – Dec 2025
Dec 2025
1.1 km away - New homes
10 new homes completedhouses · Nov 2025
Nov 2025
1.8 km away - New homes
31 new homes completed4 flats, 27 houses · Nov 2024 – Oct 2025
Oct 2025
1.8 km away - Planning permissionOct 2025
1.6 km away - New homes
4homes extended 2021–2025, typically adding 29 m²
9since energy certificates began (2008)
1in TS6 0AH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
70hours of spills in 2025 between them (typical neighbourhood: about 36)
28spill events counted
- Northumbrian Water
Dormer Way Psinto Normanby Beck6 spills, 35 hours in 2025
1.9 km away - Northumbrian Water
Abbey Court (Ampleforth Avenue) Csointo Cross Beck8 spills, 16 hours in 2025
950 m away - Northumbrian Water
Skippers Lane Industrial Estate Psinto Spencer Beck5 spills, 12 hours in 2025
1.6 km away - Northumbrian Water
Church Lane High Street Csointo Holme Beck9 spills, 8 hours in 2025
1.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
44 planned, approved or being built and 16 running (203 MW between them). Those within 5 km are on the map above.
- Rooftop solar
CSG Limited, Holden Close - Solar PanelsApproved, not yet built · 230 kW
Mar 2023
1.7 km away - Rooftop solar
Teesside Recycling Centre, Puddlers Road - Solar PV PanelsApproved, not yet built
Nov 2024
2.0 km away - Solar farm
Roman Terrace - Solar FarmApproved, not yet built
Jul 2025
2.1 km away - Energy from waste
Grangetown Prairie - Energy Recovery Facility, Option 1Approved, not yet built · 36 MW
Jul 2023
2.3 km away - Battery storage
Old Hall Farm, Lackenby - BESSPlanning application in · 244 MW
Aug 2025
2.6 km away - Battery storage
Greystones Road, Grangetown - Battery Energy Storage SystemApproved, not yet built · 60 MW
Dec 2021
2.6 km away - Battery storage
Wilton International, Greystones Road - Phase 1Approved, not yet built · 150 MW
Oct 2023
2.6 km away - Energy from waste
Wilton Waste Treatment Plant - Waste to Energy PlantApproved, not yet built
Jan 2026
2.8 km away - Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024
3.4 km away - Hydrogen
Wilton International, Teesside - Green Hydrogen PlantApproved, not yet built · 8 MW
Oct 2025
4.1 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
2.9 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
4.7 km away - Decideddecided Jul 2016
5.9 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
6.0 km away - Decideddecided Feb 2024
6.7 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Imperial Park (anaerobic digestion, 2.2 km); ICI No2 (Teesport) Landfill (landfill gas, 3.1 km); Albert Road Rooftop Solar Panels (rooftop solar, 4.4 km); Wilton International (biomass, 4.6 km); Wilton 11 EfW (energy from waste, 4.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.