Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
2hours of spills in 2025 between them (typical neighbourhood: about 36)
2spill events counted
Northumbrian Water
Tedder Avenue Ssointo Stainsby Beck2 spills, 2 hours in 2025
1.8 km away
Northumbrian Water
Kell Gate Ssointo Stainton Beck0 spills, 0 hours in 2025
1.8 km away
Northumbrian Water
Allensway Csointo Stainsby Beck0 spills, 0 hours in 2025
38 planned, approved or being built and 14 running (120 MW between them). Those within 5 km are on the map above.
Rooftop solar
Viewley Hill Academy, Andover Way - Solar Pv PanelsApproved, not yet built · 170 kW
Nov 2023 1.8 km away
Battery storage
The North West & South East Sides Of The A19 - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 2025 2.1 km away
Rooftop solar
Rainbow Leisure Centre, Dalby Way - Solar PanelsApproved, not yet built · 340 kW
Dec 2024 2.9 km away
Rooftop solar
Hollywood Bowl, Aintree Oval - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Dec 2024 3.0 km away
Battery storage
Bowesfield Flexible Energy ParkApproved, not yet built · 8 MW
Oct 2021 3.7 km away
Rooftop solar
Endeavour House - Solar PanelsApproved, not yet built · 160 kW
Oct 2024 3.9 km away
Rooftop solar
David Lloyd Club, Tees Barrage Way - Solar PanelsApproved, not yet built · 460 kW
Nov 2023 4.1 km away
Rooftop solar
Armadillo Self Storage, North Tees Industrial Estate - Solar PanelsApproved, not yet built · 150 kW
May 2025 4.4 km away
Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024 4.5 km away
Rooftop solar
Dunedin House,Columbia Drive - Solar PanelsApproved, not yet built · 260 kW
Dec 20234.6 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
Major
Staindrop Drive, MiddlesbroughOptional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026 550 m away
Standard
Raisby Close, MiddlesbroughUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Oct 2026 to Oct 2026 300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 9.4 km away
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
decided Apr 2019 9.5 km away
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
Riverside Park Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022 4.9 km away
Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022 5.1 km away
Running nearest: Seamer Wind Farm - Hambleton (wind farm, 4.4 km); Albert Road Rooftop Solar Panels (rooftop solar, 4.5 km); Seamer Windfarm - Stockton on Tees (wind farm, 4.5 km); Lambs Hill (wind farm, 4.6 km); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · North of Darlington
decided Jul 2025 15.3 km away
Pre-application
East Coast Hydrogen Teesside PipelineOther Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
application due February 2028 22.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.