Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
109hours of spills in 2025 between them (typical neighbourhood: about 36)
42spill events counted
Northumbrian Water
Priory Road Csointo Old River Tees29 spills, 79 hours in 2025
1.9 km away
Northumbrian Water
Stainsby Road Csointo Old River Tees7 spills, 26 hours in 2025
1.8 km away
Northumbrian Water
Deepdale Avenue Csointo Marton West Beck4 spills, 2 hours in 2025
1.7 km away
Northumbrian Water
Ravenscroft Ave Csointo Marton West Beck2 spills, 2 hours in 2025
42 planned, approved or being built and 15 running (125 MW between them). Those within 5 km are on the map above.
Battery storage
The North West & South East Sides Of The A19 - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 2025 1.7 km away
Rooftop solar
Viewley Hill Academy, Andover Way - Solar Pv PanelsApproved, not yet built · 170 kW
Nov 2023 2.3 km away
Rooftop solar
Hollywood Bowl, Aintree Oval - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Dec 2024 2.5 km away
Rooftop solar
Rainbow Leisure Centre, Dalby Way - Solar PanelsApproved, not yet built · 340 kW
Dec 2024 3.0 km away
Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024 3.4 km away
Rooftop solar
Endeavour House - Solar PanelsApproved, not yet built · 160 kW
Oct 2024 3.6 km away
Rooftop solar
Armadillo Self Storage, North Tees Industrial Estate - Solar PanelsApproved, not yet built · 150 kW
May 2025 3.7 km away
Rooftop solar
David Lloyd Club, Tees Barrage Way - Solar PanelsApproved, not yet built · 460 kW
Nov 2023 3.7 km away
Rooftop solar
Riverside Park Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022 4.0 km away
Battery storage
Bowesfield Flexible Energy ParkApproved, not yet built · 8 MW
Oct 20214.0 km away
Road and street works within 1 km
4 permitted works running now or planned, 3 of them major.
Major
Staindrop Drive, MiddlesbroughOptional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026 550 m away
Major, planned
Greenwood Avenue, MiddlesbroughHighway improvement works · MIDDLESBROUGH BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 950 m away
Major
Greenwood Avenue, MiddlesbroughHighway improvement works · MIDDLESBROUGH BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 950 m away
Standard
Ullswater Avenue, MiddlesbroughUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Oct 2026 to Oct 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 8.3 km away
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
decided Apr 2019 8.6 km away
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
Permission for 44 homesPinewood Avenue, Grove Hill (Hillside Gardens) (full planning permission)
Apr 2021 1.5 km away
Planning permission
Permission for 252 homesKeith Road/The Vale, Grove Hill (Hillside Gardens) (full planning permission)
Apr 2021 1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 26 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022 4.0 km away
Rooftop solar
Dunedin House,Columbia Drive - Solar PanelsApproved, not yet built · 260 kW
Dec 2023 4.5 km away
Running nearest: Albert Road Rooftop Solar Panels (rooftop solar, 3.5 km); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 4.2 km); Lambs Hill (wind farm, 5.0 km); Seamer Wind Farm - Hambleton (wind farm, 5.4 km); Seamer Windfarm - Stockton on Tees (wind farm, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · North of Darlington
decided Jul 2025 15.5 km away
Pre-application
East Coast Hydrogen Teesside PipelineOther Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
application due February 2028 22.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.