Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
844hours of spills in 2025 between them (typical neighbourhood: about 36)
221spill events counted
Northumbrian Water
Portrack Sewage Treatment Worksinto River Tees (Saline Estuary)52 spills, 378 hours in 2025
2.0 km away
Northumbrian Water
Portrack Sewage Treatment Worksinto River Tees (Saline Estuary)58 spills, 273 hours in 2025
2.0 km away
Northumbrian Water
Priory Road Csointo Old River Tees29 spills, 79 hours in 2025
1.6 km away
Northumbrian Water
Old River Tees Pumping Stationinto Old River Tees25 spills, 59 hours in 2025
1.8 km away
Northumbrian Water
Stainsby Road Csointo Old River Tees7 spills, 26 hours in 2025
1.4 km away
Northumbrian Water
Newport Road Csointo River Tees Estuary40 spills, 22 hours in 2025
1.9 km away
Northumbrian Water
A66 Rider Sewer Csointo Old River Tees4 spills, 3 hours in 2025
1.9 km away
Northumbrian Water
Deepdale Avenue Csointo Marton West Beck4 spills, 2 hours in 2025
45 planned, approved or being built and 18 running (214 MW between them). Those within 5 km are on the map above.
Battery storage
The North West & South East Sides Of The A19 - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 2025 1.4 km away
Rooftop solar
Hollywood Bowl, Aintree Oval - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Dec 2024 1.6 km away
Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024 2.3 km away
Rooftop solar
Armadillo Self Storage, North Tees Industrial Estate - Solar PanelsApproved, not yet built · 150 kW
May 2025 2.4 km away
Rooftop solar
Riverside Park Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022 2.4 km away
Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022 2.5 km away
Rooftop solar
David Lloyd Club, Tees Barrage Way - Solar PanelsApproved, not yet built · 460 kW
Nov 2023 2.9 km away
Rooftop solar
Endeavour House - Solar PanelsApproved, not yet built · 160 kW
Oct 2024 3.0 km away
Battery storage
Riverside Park Industrial Estate - Battery Energy StorageApproved, not yet built · 200 kW
May 2025 3.2 km away
Rooftop solar
Bulkhaul, Brignell Road - Solar PanelsApproved, not yet built · 560 kW
Road and street works within 1 km
38 permitted works running now or planned, 36 of them major.
Major
Roman Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Jan 2027 250 m away
Major, planned
Linden Grove, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Feb 2027 to Mar 2027 250 m away
Major
Dorset Close, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Oct 2026 to Nov 2026 300 m away
Major
Ventnor Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Oct 2026 to Oct 2026 350 m away
Major
Tavistock Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Oct 2026 to Nov 2026 350 m away
Major, planned
Cherryfield Drive, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Feb 2027 to Mar 2027 350 m away
Major
Lambeth Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Oct 2026 to Oct 2026 350 m away
Major
Devonshire Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Dec 2026 400 m away
Major
Queens Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Oct 2026 to Oct 2026400 m away
Major infrastructure projects within 30 km
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 7.1 km away
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
application due February 2027 7.4 km away
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
Permission for 44 homesPinewood Avenue, Grove Hill (Hillside Gardens) (full planning permission)
Apr 2021 1.3 km away
Planning permission
Permission for 252 homesKeith Road/The Vale, Grove Hill (Hillside Gardens) (full planning permission)
Apr 2021 1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 38 postcodes nearby had new homes completed in the last two years.
Mar 2025 3.2 km away
Biomass
Billingham Biomass Power StationApproved, not yet built · 50 MW
Oct 2009 3.5 km away
Rooftop solar
Wilton Engineering Services, Port Clarence Offshore Base - Solar PanelsApproved, not yet built · 1 MW
Sept 2025 3.5 km away
Running nearest: Albert Road Rooftop Solar Panels (rooftop solar, 2.1 km); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 2.7 km); Billingham Chemical Works (energy from waste, 4.1 km); Haverton Hill Incinerator (energy from waste, 4.2 km); North East Energy Recovery Centre (adjacent to Teesside EfW) (energy from waste, 4.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major, planned
Northgate Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Priority working
Jan 2027 to Feb 2027 400 m away
Major
Windsor Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Priority working
Oct 2026 to Nov 2026 400 m away
Major
Ayresome Park Road, MiddlesbroughUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Oct 2026 to Nov 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · North of Darlington
decided Jul 2025 15.0 km away
Pre-application
East Coast Hydrogen Teesside PipelineOther Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
application due February 2028 22.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.