Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
961hours of spills in 2025 between them (typical neighbourhood: about 36)
146spill events counted
Northumbrian Water
Cargo Fleet Spsinto Ormsby Beck81 spills, 783 hours in 2025
1.8 km away
Northumbrian Water
Leven Road Csointo Ormesby Beck21 spills, 82 hours in 2025
1.5 km away
Northumbrian Water
Dormer Way Psinto Normanby Beck6 spills, 35 hours in 2025
1.2 km away
Northumbrian Water
Grove Road Cso M009into Ormesby Beck14 spills, 28 hours in 2025
1.8 km away
Northumbrian Water
Skippers Lane Industrial Estate Psinto Spencer Beck5 spills, 12 hours in 2025
1.0 km away
Northumbrian Water
Veronica Street Csointo Ormesby Beck4 spills, 12 hours in 2025
1.9 km away
Northumbrian Water
Oakfield Road Csointo Ormesby Beck5 spills, 4 hours in 2025
1.7 km away
Northumbrian Water
Thornton Street Psinto Middle Beck (Tees Catchment)5 spills, 3 hours in 2025
47 planned, approved or being built and 17 running (211 MW between them). Those within 5 km are on the map above.
Solar farm
Roman Terrace - Solar FarmApproved, not yet built
Jul 2025 1.9 km away
Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024 2.1 km away
Rooftop solar
Teesside Recycling Centre, Puddlers Road - Solar PV PanelsApproved, not yet built
Nov 2024 2.3 km away
Rooftop solar
CSG Limited, Holden Close - Solar PanelsApproved, not yet built · 230 kW
Mar 2023 2.6 km away
Energy from waste
Grangetown Prairie - Energy Recovery Facility, Option 1Approved, not yet built · 36 MW
Jul 2023 3.1 km away
Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022 3.5 km away
Rooftop solar
Wilton Engineering Services, Port Clarence Offshore Base - Solar PanelsApproved, not yet built · 1 MW
Sept 2025 3.6 km away
Biomass
Port Clarence Biomass PlantBeing built · 40 MW
Nov 2015 3.7 km away
Rooftop solar
Huntsman Drive, Seal Sands - Solar PV PanelsPlanning application in · 370 kW
May 2026 3.8 km away
Battery storage
Greystones Road, Grangetown - Battery Energy Storage SystemApproved, not yet built · 60 MW
Dec 2021 4.0 km away
Road and street works within 1 km
45 permitted works running now or planned, 41 of them major.
Major, planned
Cargo Fleet Lane, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Jan 2027 to Feb 2027 150 m away
Major, planned
Edridge Green, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Jan 2027 to Feb 2027 200 m away
Major, planned
Eltisley Green, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Jan 2027 to Feb 2027 300 m away
Major, planned
Homerton Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Jan 2027 to Feb 2027 300 m away
Major, planned
Elvington Green, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Jan 2027 to Feb 2027 350 m away
Major
Berwick Hills Avenue, MiddlesbroughOptional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026 350 m away
Major, planned
Ruth Avenue, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Dec 2026 to Jan 2027 350 m away
Major, planned
Tranmere Avenue, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Dec 2026 to Jan 2027 350 m away
Major, planned
Ellesmere Walk, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Jan 2027 to Feb 2027400 m away
Major infrastructure projects within 30 km
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
decided Apr 2019 4.2 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 4.8 km away
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
Battery storage
Wilton International, Greystones Road - Phase 1Approved, not yet built · 150 MW
Oct 2023 4.0 km away
Battery storage
Old Hall Farm, Lackenby - BESSPlanning application in · 244 MW
Aug 2025 4.0 km away
Running nearest: Imperial Park (anaerobic digestion, 2.0 km); Albert Road Rooftop Solar Panels (rooftop solar, 3.1 km); ICI No2 (Teesport) Landfill (landfill gas, 3.8 km); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 4.2 km); Haverton Hill Incinerator (energy from waste, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major, planned
Epworth Green, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Jan 2027 to Feb 2027 400 m away
Major, planned
Kedward Avenue, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026 500 m away
Major, planned
Hershall Drive, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Dec 2026 to Jan 2027 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Other Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.