What's changing near TS3 7JY
Within 2 km, around Berwick Hills in Middlesbrough. Building, planning, schools, transport, prices and crime.
357new homes completed within 2 km, last 2 years
573homes given permission on brownfield sites since 2021
+8.3%like-for-like prices in Berwick Hills, 2024 → 2025 (council +4.3%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
28 new homes completedhouses · Feb 2026 – Aug 2026
Aug 2026
1.8 km away - New homes
21 new homes completedhouses · Sep 2025 – May 2026
May 2026
1.8 km away - New homes
25 new homes completedhouses · Nov 2025 – May 2026
May 2026
2.0 km away - New homes
34 new homes completedhouses · Oct 2025 – May 2026
May 2026
1.9 km away - New homes
15 new homes completedhouses · Apr 2026
May 2026
1.8 km away - New homes
5 new homes completedhouses · May 2026
May 2026
1.3 km away - New homes
29 new homes completedhouses · Aug 2025 – Apr 2026
Apr 2026
1.8 km away - New homes
24 new homes completedhouses · Jan 2026
Feb 2026
1.9 km away - New homes
10 new homes completedhouses · Nov 2025
Nov 2025
1.2 km away - New homes
5 new homes completedhouses · Nov 2025
Nov 2025
1.3 km away - New homes
8 new homes completedhouses · May 2025 – Nov 2025
Nov 2025
2.0 km away - New homes
12 new homes completedhouses · Nov 2025
Nov 2025
2.0 km away - New homes
7homes extended 2021–2025, typically adding 22 m²
22since energy certificates began (2008)
0in TS3 7JY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
146hours of spills in 2025 between them (typical neighbourhood: about 36)
64spill events counted
- Northumbrian Water
Leven Road Csointo Ormesby Beck21 spills, 82 hours in 2025
1.7 km away - Northumbrian Water
Grove Road Cso M009into Ormesby Beck14 spills, 28 hours in 2025
1.5 km away - Northumbrian Water
Skippers Lane Industrial Estate Psinto Spencer Beck5 spills, 12 hours in 2025
2.0 km away - Northumbrian Water
Veronica Street Csointo Ormesby Beck4 spills, 12 hours in 2025
1.6 km away - Northumbrian Water
Oakfield Road Csointo Ormesby Beck5 spills, 4 hours in 2025
1.3 km away - Northumbrian Water
Thornton Street Psinto Middle Beck (Tees Catchment)5 spills, 3 hours in 2025
1.4 km away - Northumbrian Water
James Street Ssointo Middle Beck (Tees)5 spills, 2 hours in 2025
1.8 km away - Northumbrian Water
Deepdale Avenue Csointo Marton West Beck4 spills, 2 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
45 planned, approved or being built and 18 running (216 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024
1.7 km away - Solar farm
Roman Terrace - Solar FarmApproved, not yet built
Jul 2025
2.8 km away - Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022
3.2 km away - Rooftop solar
Teesside Recycling Centre, Puddlers Road - Solar PV PanelsApproved, not yet built
Nov 2024
3.3 km away - Rooftop solar
Wilton Engineering Services, Port Clarence Offshore Base - Solar PanelsApproved, not yet built · 1 MW
Sept 2025
3.6 km away - Rooftop solar
CSG Limited, Holden Close - Solar PanelsApproved, not yet built · 230 kW
Mar 2023
3.7 km away - Biomass
Port Clarence Biomass PlantBeing built · 40 MW
Nov 2015
3.8 km away - Rooftop solar
Rainbow Leisure Centre, Dalby Way - Solar PanelsApproved, not yet built · 340 kW
Dec 2024
3.8 km away - Rooftop solar
Riverside Park Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022
4.1 km away - Energy from waste
Grangetown Prairie - Energy Recovery Facility, Option 1Approved, not yet built · 36 MW
Jul 2023
4.2 km away
Road and street works within 1 km
42 permitted works running now or planned, 41 of them major.
- Major
Ormesby Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Dec 2026
250 m away - Major, planned
Oban Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Nov 2026 to Dec 2026
250 m away - Major, planned
Gatwick Green, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Nov 2026
250 m away - Major, planned
Roslyn Avenue, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Nov 2026 to Dec 2026
250 m away - Major
Garsdale Green, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Dec 2026
300 m away - Major, planned
Newick Avenue, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Nov 2026 to Jan 2027
300 m away - Major
Gribdale Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Some carriageway incursion
Oct 2026 to Dec 2026
350 m away - Major, planned
Malling Walk, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Jan 2027
400 m away - Major
Kimberley Drive, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Oct 2026 to Nov 2026
400 m away
Major infrastructure projects within 30 km
- Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
5.3 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
5.6 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
6.5 km away - Decideddecided Jul 2016
7.3 km away - Decideddecided Feb 2024
8.6 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Albert Road Rooftop Solar Panels (rooftop solar, 2.7 km); Imperial Park (anaerobic digestion, 2.9 km); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 3.8 km); ICI No2 (Teesport) Landfill (landfill gas, 4.8 km); Haverton Hill Incinerator (energy from waste, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.