Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
135hours of spills in 2025 between them (typical neighbourhood: about 36)
61spill events counted
Northumbrian Water
Leven Road Csointo Ormesby Beck21 spills, 82 hours in 2025
1.8 km away
Northumbrian Water
Grove Road Cso M009into Ormesby Beck14 spills, 28 hours in 2025
1.5 km away
Northumbrian Water
Veronica Street Csointo Ormesby Beck4 spills, 12 hours in 2025
1.6 km away
Northumbrian Water
Oakfield Road Csointo Ormesby Beck5 spills, 4 hours in 2025
1.3 km away
Northumbrian Water
Thornton Street Psinto Middle Beck (Tees Catchment)5 spills, 3 hours in 2025
1.6 km away
Northumbrian Water
James Street Ssointo Middle Beck (Tees)5 spills, 2 hours in 2025
1.9 km away
Northumbrian Water
Deepdale Avenue Csointo Marton West Beck4 spills, 2 hours in 2025
1.2 km away
Northumbrian Water
Ravenscroft Ave Csointo Marton West Beck2 spills, 2 hours in 2025
45 planned, approved or being built and 17 running (211 MW between them). Those within 5 km are on the map above.
Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024 1.6 km away
Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022 3.1 km away
Solar farm
Roman Terrace - Solar FarmApproved, not yet built
Jul 2025 3.2 km away
Rooftop solar
Wilton Engineering Services, Port Clarence Offshore Base - Solar PanelsApproved, not yet built · 1 MW
Sept 2025 3.6 km away
Rooftop solar
Rainbow Leisure Centre, Dalby Way - Solar PanelsApproved, not yet built · 340 kW
Dec 2024 3.6 km away
Rooftop solar
Teesside Recycling Centre, Puddlers Road - Solar PV PanelsApproved, not yet built
Nov 2024 3.7 km away
Biomass
Port Clarence Biomass PlantBeing built · 40 MW
Nov 2015 3.7 km away
Rooftop solar
Riverside Park Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022 3.9 km away
Battery storage
The North West & South East Sides Of The A19 - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 2025 3.9 km away
Rooftop solar
Viewley Hill Academy, Andover Way - Solar Pv PanelsApproved, not yet built · 170 kW
Nov 2023 4.0 km away
Road and street works within 1 km
25 permitted works running now or planned, 24 of them major.
Major
Ormesby Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Dec 2026 700 m away
Major, planned
Oban Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Nov 2026 to Dec 2026 700 m away
Major, planned
Gatwick Green, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Nov 2026 700 m away
Major
Kelvin Grove, MiddlesbroughUtility repair and maintenance works · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026 700 m away
Major
Garsdale Green, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · No carriageway incursion
Nov 2026 to Dec 2026 750 m away
Major, planned
Delamere Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Multi-way signals
Sept 2026 to Oct 2026 750 m away
Major
Delamere Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Multi-way signals
Oct 2026 to Oct 2026 750 m away
Major, planned
Roslyn Avenue, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Nov 2026 to Dec 2026 750 m away
Major
Parklands Close, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Sept 2026 to Oct 2026 750 m away
Major infrastructure projects within 30 km
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
decided Apr 2019 5.8 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 5.9 km away
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 29 postcodes nearby had new homes completed in the last two years.
Battery storage
Riverside Park Industrial Estate - Battery Energy StorageApproved, not yet built · 200 kW
May 2025 4.1 km away
Rooftop solar
Bulkhaul, Brignell Road - Solar PanelsApproved, not yet built · 560 kW
Mar 2025 4.1 km away
Running nearest: Albert Road Rooftop Solar Panels (rooftop solar, 2.5 km); Imperial Park (anaerobic digestion, 3.3 km); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 3.7 km); ICI No2 (Teesport) Landfill (landfill gas, 5.2 km); Haverton Hill Incinerator (energy from waste, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major
Gribdale Road, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Some carriageway incursion
Oct 2026 to Dec 2026 750 m away
Major, planned
Newick Avenue, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Nov 2026 to Jan 2027 800 m away
Major
Parkway Grove, MiddlesbroughUtility asset works · NORTHUMBRIAN WATER · Give and take
Sept 2026 to Oct 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · North of Darlington
decided Jul 2025 17.5 km away
Pre-application
East Coast Hydrogen Teesside PipelineOther Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
application due February 2028 19.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.