Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
23hours of spills in 2025 between them (typical neighbourhood: about 36)
42 planned, approved or being built and 15 running (201 MW between them). Those within 5 km are on the map above.
Rooftop solar
CSG Limited, Holden Close - Solar PanelsApproved, not yet built · 230 kW
Mar 2023 3.1 km away
Solar farm
Roman Terrace - Solar FarmApproved, not yet built
Jul 2025 3.2 km away
Rooftop solar
Teesside Recycling Centre, Puddlers Road - Solar PV PanelsApproved, not yet built
Nov 2024 3.3 km away
Battery storage
Old Hall Farm, Lackenby - BESSPlanning application in · 244 MW
Aug 2025 3.3 km away
Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024 3.4 km away
Energy from waste
Grangetown Prairie - Energy Recovery Facility, Option 1Approved, not yet built · 36 MW
Jul 2023 3.6 km away
Battery storage
Greystones Road, Grangetown - Battery Energy Storage SystemApproved, not yet built · 60 MW
Dec 2021 3.6 km away
Battery storage
Wilton International, Greystones Road - Phase 1Approved, not yet built · 150 MW
Oct 2023 3.6 km away
Energy from waste
Wilton Waste Treatment Plant - Waste to Energy PlantApproved, not yet built
Jan 2026 3.9 km away
Rooftop solar
Rainbow Leisure Centre, Dalby Way - Solar PanelsApproved, not yet built · 340 kW
Dec 2024 4.2 km away
Road and street works within 1 km
6 permitted works running now or planned.
Standard
Fosdyke Green, MiddlesbroughNew service connection · NORTHERN GAS NETWORKS · No carriageway incursion
Oct 2026 to Oct 2026 250 m away
Standard
Fulbeck Road, MiddlesbroughUtility asset works · BT · Give and take
Oct 2026 to Oct 2026 450 m away
Minor
Thursby Drive, OrmesbyOptional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Two-way signals
Oct 2026 to Oct 2026 300 m away
Minor
Sunnyfield, OrmesbyUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away
Minor
Sunnyfield, OrmesbyUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 750 m away
Minor
Orchard Way, OrmesbyUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
decided Apr 2019 4.0 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 5.9 km away
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022 5.0 km away
Rooftop solar
Wilton Engineering Services, Port Clarence Offshore Base - Solar PanelsApproved, not yet built · 1 MW
Sept 2025 5.1 km away
Running nearest: Imperial Park (anaerobic digestion, 3.3 km); Albert Road Rooftop Solar Panels (rooftop solar, 4.4 km); ICI No2 (Teesport) Landfill (landfill gas, 4.5 km); Wilton International (biomass, 5.3 km); Wilton 11 EfW (energy from waste, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Other Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.