Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
924hours of spills in 2025 between them (typical neighbourhood: about 36)
137spill events counted
Northumbrian Water
Tilery Farm Strage Tank Csointo Heads Hope Burn63 spills, 650 hours in 2025
1.7 km away
Northumbrian Water
Throstles Nest Spsinto Gore Burn32 spills, 135 hours in 2025
1.7 km away
Northumbrian Water
Woodland View Csointo Trib. Of Heads Hope Burn20 spills, 71 hours in 2025
800 m away
Northumbrian Water
Throstles Nest Storage Tankinto Gore Burn8 spills, 44 hours in 2025
1.7 km away
Northumbrian Water
Wellfield Spsinto Castle Eden Burn Trib14 spills, 26 hours in 2025
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
application due February 2027 17.9 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
decided Apr 2019 24.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.