Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
650hours of spills in 2025 between them (typical neighbourhood: about 36)
63spill events counted
Northumbrian Water
Tilery Farm Strage Tank Csointo Heads Hope Burn63 spills, 650 hours in 2025
34 planned, approved or being built and 13 running (139 MW between them). Those within 5 km are on the map above.
Anaerobic digestion
Hulam Farm, Hutton Henry - Anaerobic Digestion PlantApproved, not yet built
Jul 2017 1.6 km away
Solar farm
Sheraton Hall Solar FarmApproved, not yet built · 50 MW
Dec 2023 1.8 km away
Battery storage
Whelley Hill Farm, Worset Lane - Battery Energy StorageApproved, not yet built · 50 MW
Dec 2023 3.4 km away
Rooftop solar
Peterlee Leisure Centre - Solar PanelsApproved, not yet built · 150 kW
Feb 2022 4.2 km away
Solar farm
High Barnes Farm, Coal Lane - Solar FarmApproved, not yet built · 50 MW
May 2025 4.3 km away
Battery storage
High Barnes Farm, Coal Lane - Battery StorageApproved, not yet built · 25 MW
May 2025 4.3 km away
Rooftop solar
Howletch Lane Primary School -Solar PanelsApproved, not yet built · 190 kW
Dec 2025 4.5 km away
Solar farm
Benridge Farm, Fillpoke Lane - Solar PanelsPlanning application in · 48 MW
Jul 2025 4.5 km away
Battery storage
Benridge Farm, Fillpoke Lane - Battery Energy Storage SystemPlanning application in · 12 MW
Jul 2025 4.5 km away
Rooftop solar
East Durham College, Willerby Grove - Solar panelsApproved, not yet built · 460 kW
Jun 2023 5.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
application due February 2027 14.8 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.