8new homes completed within 2 km, last 2 years
65homes given permission on brownfield sites since 2021
+6.7%like-for-like prices in Foggy Furze, 2024 → 2025 (council +3.3%)
-17%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permission
Permission for 17 homesGardenCentre&AmenityBlock,TanfieldRd, Foggy Furze (full planning permission)
May 2022
800 m away - Planning permission
Permission for 48 homesWhitby Street and Lynn Street, Burn Valley Ward (full planning permission)
Nov 2021
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
31homes extended 2021–2025, typically adding 21 m²
99since energy certificates began (2008)
0in TS25 5RZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
36hours of spills in 2025 between them (typical neighbourhood: about 36)
20spill events counted
- Northumbrian Water
Bridge Street Spsinto North Sea10 spills, 31 hours in 2025
1.7 km away - Northumbrian Water
Cso At Rear Of Holly Houseinto Stream Trib Of Hartlepool Bay4 spills, 3 hours in 2025
1.4 km away - Northumbrian Water
Brenda Road/Park View Csointo The Stell · near bathing water: Seaton Carew Centre3 spills, 2 hours in 2025
1.5 km away - Northumbrian Water
Brenda Road/Park View Csointo Stell · near bathing water: Seaton Carew Centre2 spills, 1 hours in 2025
1.9 km away - Northumbrian Water
Clifton Lodge Csointo Tributary Of The North Sea0 spills, 0 hours in 2025
1000 m away - Northumbrian Water
Coniscliffe Road Csointo Burn Valley Beck1 spills, 0 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
32 planned, approved or being built and 9 running (103 MW between them). Those within 5 km are on the map above.
- Rooftop solar
J and B Recycling, Thomlinson Road - Solar PanelsApproved, not yet built · 940 kW
Feb 2026
750 m away - Rooftop solar
Stockton Street - Solar ArrayApproved, not yet built · 640 kW
Nov 2023
800 m away - Battery storage
Worset Lane - Battery Energy Storage SystemApproved, not yet built · 200 MW
Jan 2023
1.2 km away - Rooftop solar
Lynnfield Primary School, Grosvenor Street - Solar PanelsPlanning application in · 190 kW
Oct 2025
1.3 km away - Rooftop solar
Clarence Road - Solar PanelsApproved, not yet built · 600 kW
Apr 2022
1.5 km away - Rooftop solar
Omya UK Limited, Middleton Road - Solar PanelsApproved, not yet built · 500 kW
Dec 2024
2.4 km away - Solar farm
The University Hospital Of Hartlepool, Holdforth Road - Solar PhotovoltaicApproved, not yet built · 610 kW
Apr 2025
3.1 km away - Rooftop solar
The University Hospital Of Hartlepool, Holdforth Road - Solar PanelsApproved, not yet built
Mar 2025
3.1 km away - Wind farm
Tofts Road - Single Wind TurbinePlanning application in · 4 MW
Jul 2025
3.5 km away - Energy from waste
Graythorpe Energy CentreApproved, not yet built · 50 MW
Aug 2020
3.5 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major
Brinkburn Road, HartlepoolHighway improvement works · HARTLEPOOL BOROUGH COUNCIL · Two-way signals
Oct 2026 to Oct 2026
400 m away - Minor
Heathfield Drive, HartlepoolOptional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Multi-way signals
Oct 2026 to Oct 2026
350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
6.7 km away - Decideddecided Jul 2016
7.9 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
8.1 km away - Decideddecided Feb 2024
8.9 km away - Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
12.6 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Dean Group Business Park - Hartlepool (anaerobic digestion, 3.2 km); High Volts Wind Farm (wind farm, 5.6 km); Land at Bluehouse Farm (solar farm, 5.7 km); Stob House Farm (solar farm, 6.8 km); Red Gap Moor Wind Farm (wind farm, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.