What's changing near TS25 1HN
Within 2 km, around Rossmere & Mill in Hartlepool. Building, planning, schools, transport, prices and crime.
157new homes completed within 2 km, last 2 years
17homes given permission on brownfield sites since 2021
+4.6%like-for-like prices in Rossmere & Mill, 2024 → 2025 (council +3.3%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
38 new homes completedhouses · Oct 2024 – Aug 2026
Aug 2026
450 m away - New homes
61 new homes completedhouses · Mar 2025 – Jun 2026
Jun 2026
600 m away - New homes
43 new homes completedhouses · Nov 2024 – Jan 2026
Jan 2026
350 m away - New homes
12 new homes completedhouses · Apr 2025
Apr 2025
550 m away - Planning permission
Permission for 17 homesGardenCentre&AmenityBlock,TanfieldRd, Foggy Furze (full planning permission)
May 2022
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 39 m²
2since energy certificates began (2008)
0in TS25 1HN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
22hours of spills in 2025 between them (typical neighbourhood: about 36)
10spill events counted
- Northumbrian Water
Glentower Grove Spsinto Trib North Sea (At Carr House) · near bathing water: Seaton Carew North3 spills, 19 hours in 2025
900 m away - Northumbrian Water
Brenda Road/Park View Csointo The Stell · near bathing water: Seaton Carew Centre3 spills, 2 hours in 2025
550 m away - Northumbrian Water
Brenda Road/Park View Csointo Stell · near bathing water: Seaton Carew Centre2 spills, 1 hours in 2025
850 m away - Northumbrian Water
Brenda Road Csointo Stell, Tributary Of · near bathing water: Seaton Carew Centre1 spills, 0 hours in 2025
500 m away - Northumbrian Water
South End Cottages Csointo Culverted Watercourse To North Sea1 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
42 planned, approved or being built and 14 running (126 MW between them). Those within 5 km are on the map above.
- Wind farm
Tofts Road - Single Wind TurbinePlanning application in · 4 MW
Jul 2025
1.5 km away - Energy from waste
Graythorpe Energy CentreApproved, not yet built · 50 MW
Aug 2020
1.6 km away - Rooftop solar
J and B Recycling, Thomlinson Road - Solar PanelsApproved, not yet built · 940 kW
Feb 2026
1.7 km away - Rooftop solar
Stockton Street - Solar ArrayApproved, not yet built · 640 kW
Nov 2023
2.6 km away - Battery storage
Worset Lane - Battery Energy Storage SystemApproved, not yet built · 200 MW
Jan 2023
3.0 km away - Rooftop solar
Lynnfield Primary School, Grosvenor Street - Solar PanelsPlanning application in · 190 kW
Oct 2025
3.3 km away - Rooftop solar
Clarence Road - Solar PanelsApproved, not yet built · 600 kW
Apr 2022
3.3 km away - Rooftop solar
Omya UK Limited, Middleton Road - Solar PanelsApproved, not yet built · 500 kW
Dec 2024
3.9 km away - Solar farm
The University Hospital Of Hartlepool, Holdforth Road - Solar PhotovoltaicApproved, not yet built · 610 kW
Apr 2025
5.0 km away - Rooftop solar
The University Hospital Of Hartlepool, Holdforth Road - Solar PanelsApproved, not yet built
Mar 2025
5.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
4.8 km away - Decideddecided Jul 2016
6.0 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
6.1 km away - Decideddecided Feb 2024
7.3 km away - Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
10.7 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Dean Group Business Park - Hartlepool (anaerobic digestion, 1.2 km); Land at Bluehouse Farm (solar farm, 4.6 km); Stob House Farm (solar farm, 6.1 km); High Volts Wind Farm (wind farm, 6.9 km); Red Gap Moor Wind Farm (wind farm, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.