Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
319hours of spills in 2025 between them (typical neighbourhood: about 36)
110spill events counted
Northumbrian Water
Station Road Storm Sewage Overflowinto Billinghan Beck50 spills, 180 hours in 2025
1.1 km away
Northumbrian Water
Norton Spsinto Billingham Beck11 spills, 72 hours in 2025
1.6 km away
Northumbrian Water
Teesdale Avenue Csointo Billingham Beck15 spills, 35 hours in 2025
1.1 km away
Northumbrian Water
White House Road 1+2 Csointo Thorpe Beck, Trib Of Bill.Beck29 spills, 30 hours in 2025
1.6 km away
Northumbrian Water
White House Road 1+2 Csointo Thorpe Beck, Trib Of Bill.Beck5 spills, 2 hours in 2025
1.6 km away
Northumbrian Water
The New Road Csointo Mill Race0 spills, 0 hours in 2025
49 planned, approved or being built and 16 running (138 MW between them). Those within 5 km are on the map above.
Rooftop solar
The Forum Theatre, Town Centre - Solar PanelsApproved, not yet built
Jun 2025 900 m away
Battery storage
Belasis Avenue - Battery StorageApproved, not yet built · 75 MW
Apr 2024 1.3 km away
Biomass
Billingham Biomass Power StationApproved, not yet built · 50 MW
Oct 2009 1.9 km away
Hydrogen
Outfitting Facility, Haverton Hill Road - Hydrogen Production FacilityPlanning application in · 5 MW
Dec 2025 2.2 km away
Rooftop solar
Northfield School And Sports College, Thames Road - Solar PanelsApproved, not yet built · 540 kW
Apr 2024 2.6 km away
Battery storage
Riverside Park Industrial Estate - Battery Energy StorageApproved, not yet built · 200 kW
May 2025 2.8 km away
Rooftop solar
Bulkhaul, Brignell Road - Solar PanelsApproved, not yet built · 560 kW
Mar 2025 2.8 km away
Rooftop solar
Riverside Park Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022 2.9 km away
Rooftop solar
Armadillo Self Storage, North Tees Industrial Estate - Solar PanelsApproved, not yet built · 150 kW
May 2025 2.9 km away
Biomass
Port Clarence Biomass PlantBeing built · 40 MW
Nov 2015 3.7 km away
Road and street works within 1 km
2 permitted works running now or planned.
Standard
Swaledale Crescent, BillinghamUtility repair and maintenance works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026 350 m away
Standard
Belasis Avenue, BillinghamHighway improvement works · STOCKTON-ON-TEES BOROUGH COUNCIL · Lane closure
Oct 2026 to Nov 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
application due February 2027 6.0 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
David Lloyd Club, Tees Barrage Way - Solar PanelsApproved, not yet built · 460 kW
Nov 2023 3.7 km away
Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022 3.7 km away
Running nearest: Billingham Chemical Works (energy from waste, 1.1 km); Haverton Hill Incinerator (energy from waste, 1.6 km); North East Energy Recovery Centre (adjacent to Teesside EfW) (energy from waste, 1.7 km); Teesside EfW (energy from waste, 1.7 km); Teesside EfW (extension) (energy from waste, 1.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · North of Darlington
decided Jul 2025 12.4 km away
Pre-application
East Coast Hydrogen Teesside PipelineOther Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
application due February 2028 24.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.