What's changing near TS21 2DJ
Within 2 km, around Sedgefield & Bishop Middleham in County Durham. Building, planning, schools, transport, prices and crime.
1new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.8%like-for-like prices in Sedgefield & Bishop Middleham, 2024 → 2025 (council +5.4%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 33 m²
14since energy certificates began (2008)
1in TS21 2DJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
157hours of spills in 2025 between them (typical neighbourhood: about 36)
74spill events counted
- Northumbrian Water
Sedgefield Sewage Treatment Worksinto Shotton Beck, Tributary Of15 spills, 77 hours in 2025
550 m away - Northumbrian Water
Stockton Road Cso (Se 024)into Shotton Beck28 spills, 45 hours in 2025
650 m away - Northumbrian Water
East End Cso (Se 026)into Tributary Of Redcar Beck26 spills, 26 hours in 2025
900 m away - Northumbrian Water
Beacon Avenue Spsinto Redcar Beck1 spills, 6 hours in 2025
950 m away - Northumbrian Water
The Meadows Cso (Se 022)into Unnamed Trib Of Shotton Beck4 spills, 3 hours in 2025
150 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
32 planned, approved or being built and 10 running (98 MW between them). Those within 5 km are on the map above.
- Rooftop solar
PFF Packaging, Salters Lane Industrial Estate, Sedgefield - Solar PV PanelsPlanning application in · 1 MW
Mar 2025
1.4 km away - Rooftop solar
The Neville Hamlin Building, Thomas Wright Way - Solar PanelsApproved, not yet built · 250 kW
Jul 2023
2.3 km away - Solar farm
West House Farm, Fishburn - Solar FarmApproved, not yet built · 41 MW
Apr 2024
4.7 km away - Solar farm
Cowley Complex, Stockton on TeesBeing built · 120 MW
Apr 2024
5.6 km away - Battery storage
Byers Gill Solar FarmApproved, not yet built
Jul 2025
6.8 km away - Rooftop solar
York Road - Solar PV panelsApproved, not yet built · 150 kW
May 2022
7.1 km away - Solar farm
Low Raisby Farm, Kelloe - Solar PanelsPlanning application in · 25 MW
Jan 2026
7.6 km away - Solar farm
Byers Gill Solar FarmApproved, not yet built · 180 MW
Jul 2025
7.9 km away - Solar farm
Whinfield Solar FarmApproved, not yet built · 33 MW
Oct 2022
8.0 km away - Solar farm
California Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Mar 2023
8.1 km away - Battery storage
California Farm - Solar Farm & Battery Storage
Road and street works within 1 km
6 permitted works running now or planned, 3 of them major.
- Major
The Leas, SedgefieldHighway repair and maintenance works · NORTHUMBRIAN WATER · Road closure
Sept 2026 to Jul 2027
150 m away - Major, planned
West Park Lane, SedgefieldNew service connection · NORTHERN POWERGRID (NORTHEAST) PLC · Road closure
Nov 2026 to Nov 2026
600 m away - Major, planned
Eastwell Close, SedgefieldUtility repair and maintenance works · BT · Road closure
Nov 2026 to Dec 2026
650 m away - Standard
Station Road, SedgefieldUtility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026
650 m away - Standard
Elm Avenue, SedgefieldUtility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026
900 m away - Minor
East End, SedgefieldUtility repair and maintenance works · BT · Some carriageway incursion
Nov 2026 to Nov 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jul 2025
6.8 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
16.7 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
18.0 km away - Decideddecided Jul 2016
19.6 km away - Decideddecided Feb 2024
21.4 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Butterwick Moor (wind farm, 3.7 km); Walkway (wind farm, 3.7 km); Chilton Energy Plant (biomass, 7.8 km); High Meadow Farm (solar farm, 7.9 km); Trimdon Grange (wind farm, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.