H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
application due February 2027 11.6 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 11.6 km away
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Rooftop solar
Viewley Hill Academy, Andover Way - Solar Pv PanelsApproved, not yet built · 170 kW
Nov 2023 5.6 km away
Rooftop solar
Riverside Park Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022 5.9 km away
Running nearest: Lambs Hill (wind farm, 850 m); Eaglescliffe Solar Farm (solar farm, 2.4 km); Seamer Wind Farm - Hambleton (wind farm, 6.1 km); Billingham Chemical Works (energy from waste, 6.3 km); Seamer Windfarm - Stockton on Tees (wind farm, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Land at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QW
decided Feb 2024 15.4 km away
Pre-application
East Coast Hydrogen Teesside PipelineOther Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
application due February 2028 26.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.