Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
25storm overflows within 2 km
1,540hours of spills in 2025 between them (typical neighbourhood: about 36)
435spill events counted
Northumbrian Water
Grays Road Csointo Lustrum Beck37 spills, 369 hours in 2025
1000 m away
Northumbrian Water
Eastbourne South/Dundas St Csointo Lustrum Beck44 spills, 182 hours in 2025
1.6 km away
Northumbrian Water
Bishopton Road Csointo Lustrum Beck28 spills, 152 hours in 2025
1.2 km away
Northumbrian Water
Grangefield Road Ssointo Lustrum Beck31 spills, 99 hours in 2025
900 m away
Northumbrian Water
Londonderry Road/Green Lane Csointo Lustrum Beck26 spills, 92 hours in 2025
1.2 km away
Northumbrian Water
Browns Bridge Csointo The Lustrum Beck12 spills, 89 hours in 2025
1.2 km away
Northumbrian Water
Oxbridge Lane Csointo The Lustrum Beck14 spills, 83 hours in 2025
1000 m away
Northumbrian Water
Eastbourne East & West Csointo Lustrum Beck40 spills, 75 hours in 2025
41 planned, approved or being built and 16 running (142 MW between them). Those within 5 km are on the map above.
Rooftop solar
Dunedin House,Columbia Drive - Solar PanelsApproved, not yet built · 260 kW
Dec 2023 850 m away
Battery storage
Bowesfield Flexible Energy ParkApproved, not yet built · 8 MW
Oct 2021 1.6 km away
Rooftop solar
Endeavour House - Solar PanelsApproved, not yet built · 160 kW
Oct 2024 1.6 km away
Rooftop solar
Sainsburys Supermarket, Barlborough Avenue - Solar PanelsApproved, not yet built · 280 kW
Feb 2026 1.8 km away
Rooftop solar
David Lloyd Club, Tees Barrage Way - Solar PanelsApproved, not yet built · 460 kW
Nov 2023 2.0 km away
Rooftop solar
Motorpoint, Yarm Road - Solar photovoltaics panelsApproved, not yet built · 170 kW
Jul 2022 2.1 km away
Rooftop solar
Fairfield Primary School, Glenfield Road - Solar PanelsApproved, not yet built · 160 kW
Nov 2025 2.6 km away
Rooftop solar
Hollywood Bowl, Aintree Oval - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Dec 2024 3.0 km away
Rooftop solar
Armadillo Self Storage, North Tees Industrial Estate - Solar PanelsApproved, not yet built · 150 kW
May 2025 3.4 km away
Battery storage
The North West & South East Sides Of The A19 - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 20253.4 km away
Road and street works within 1 km
17 permitted works running now or planned, 7 of them major.
Major
Parliament Street, Stockton-On-TeesHighway improvement works · STOCKTON-ON-TEES BOROUGH COUNCIL · Road closure
Jan 2027 to Nov 2027 300 m away
Major
Bridge Road, Stockton-On-TeesHighway improvement works · STOCKTON-ON-TEES BOROUGH COUNCIL · Road closure
Mar 2027 to Nov 2027 500 m away
Major
Bowesfield Lane, Stockton-On-TeesHighway improvement works · STOCKTON-ON-TEES BOROUGH COUNCIL · Road closure
Jan 2027 to Nov 2027 550 m away
Major
North Street, Stockton-On-TeesHighway improvement works · STOCKTON-ON-TEES BOROUGH COUNCIL · Road closure
Jan 2027 to Oct 2027 950 m away
Major
Bishopton Lane, Stockton-On-TeesHighway improvement works · STOCKTON-ON-TEES BOROUGH COUNCIL · Road closure
Jan 2027 to Oct 2027 950 m away
Major
Bowesfield Crescent, Stockton-On-TeesHighway improvement works · STOCKTON-ON-TEES BOROUGH COUNCIL · Road closure
Jan 2027 to Nov 2027 950 m away
Major
High Street, Stockton-On-TeesHighway improvement works · STOCKTON-ON-TEES BOROUGH COUNCIL · Road closure
Jun 2027 to Oct 2027 950 m away
Standard
Woodland Street, Stockton-On-TeesUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Some carriageway incursion
Oct 2026 to Nov 2026 200 m away
Standard
Grove Street, Stockton-On-TeesUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Some carriageway incursion
Major infrastructure projects within 30 km
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
application due February 2027 10.2 km away
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
Norton Substation, Letch Lane - Battery Storage FacilityApproved, not yet built
Jan 2024 4.3 km away
Solar farm
Letch Lane - Solar FarmApproved, not yet built · 11 MW
Dec 2021 4.6 km away
Running nearest: Lambs Hill (wind farm, 1.6 km); Eaglescliffe Solar Farm (solar farm, 3.1 km); Billingham Chemical Works (energy from waste, 4.6 km); High Meadow Farm (solar farm, 5.0 km); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Oct 2026 to Nov 2026 200 m away
Standard
Trinity Street, Stockton-On-TeesUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Some carriageway incursion
Oct 2026 to Nov 2026 200 m away
Standard
Westcott Street, Stockton-On-TeesUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Some carriageway incursion
Oct 2026 to Nov 2026 250 m away
Standard
Dennison Street, Stockton-On-TeesUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Oct 2026 to Oct 2026 350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · Land at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QW
decided Feb 2024 14.4 km away
Pre-application
East Coast Hydrogen Teesside PipelineOther Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
application due February 2028 26.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.