What's changing near TS1 4JR
Within 2 km, around Ayresome in Middlesbrough. Building, planning, schools, transport, prices and crime.
492new homes completed within 2 km, last 2 years
1,051homes given permission on brownfield sites since 2021
-1.9%like-for-like prices in Ayresome, 2024 → 2025 (council +4.3%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
28 new homes completedhouses · Feb 2026 – Aug 2026
Aug 2026
1.9 km away - School closed
School closed: The Northern School of ArtFurther education, 16 plus (closure)
Jul 2026
900 m away - New homes
5 new homes completedflats · Jun 2026
Jun 2026
1.1 km away - New school
New school: Fulcrum EducationOther independent special school, other independent special school
Jun 2026
1000 m away - New homes
21 new homes completedhouses · Sep 2025 – May 2026
May 2026
1.9 km away - New homes
25 new homes completedhouses · Nov 2025 – May 2026
May 2026
1.9 km away - New homes
34 new homes completedhouses · Oct 2025 – May 2026
May 2026
1.8 km away - New homes
15 new homes completedhouses · Apr 2026
May 2026
1.9 km away - New homes
29 new homes completedhouses · Aug 2025 – Apr 2026
Apr 2026
1.8 km away - New homes
24 new homes completedhouses · Jan 2026
Feb 2026
1.8 km away - New homes
5 new homes completedhouses · Dec 2024 – Feb 2026
Feb 2026
1.8 km away - New homes
7 new homes completedhouses · Feb 2026
Feb 20261.9 km away
28homes extended 2021–2025, typically adding 20 m²
159since energy certificates began (2008)
0in TS1 4JR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
791hours of spills in 2025 between them (typical neighbourhood: about 36)
237spill events counted
- Northumbrian Water
Portrack Sewage Treatment Worksinto River Tees (Saline Estuary)52 spills, 378 hours in 2025
1.8 km away - Northumbrian Water
Portrack Sewage Treatment Worksinto River Tees (Saline Estuary)58 spills, 273 hours in 2025
1.8 km away - Northumbrian Water
Acklam Street Spsinto The River Tees44 spills, 61 hours in 2025
2.0 km away - Northumbrian Water
Grove Road Cso M009into Ormesby Beck14 spills, 28 hours in 2025
1.9 km away - Northumbrian Water
Newport Road Csointo River Tees Estuary40 spills, 22 hours in 2025
1.0 km away - Northumbrian Water
Snowdon Road Psinto The River Tees23 spills, 16 hours in 2025
2.0 km away - Northumbrian Water
Veronica Street Csointo Ormesby Beck4 spills, 12 hours in 2025
1.8 km away - Northumbrian Water
Ravenscroft Ave Csointo Marton West Beck2 spills, 2 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
48 planned, approved or being built and 20 running (232 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Zetland Multi Storey Car Park, Station Street - Solar Photovoltaic PanelsApproved, not yet built
Sept 2022
1.2 km away - Rooftop solar
Riverside Park Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022
1.3 km away - Rooftop solar
Breckon Hill Primary School, Breckon Hill Road - Solar PanelsApproved, not yet built · 190 kW
Sept 2024
1.7 km away - Rooftop solar
Armadillo Self Storage, North Tees Industrial Estate - Solar PanelsApproved, not yet built · 150 kW
May 2025
1.9 km away - Battery storage
Riverside Park Industrial Estate - Battery Energy StorageApproved, not yet built · 200 kW
May 2025
1.9 km away - Rooftop solar
Bulkhaul, Brignell Road - Solar PanelsApproved, not yet built · 560 kW
Mar 2025
1.9 km away - Rooftop solar
Hollywood Bowl, Aintree Oval - Solar Photovoltaics PanelsApproved, not yet built · 300 kW
Dec 2024
2.0 km away - Rooftop solar
Wilton Engineering Services, Port Clarence Offshore Base - Solar PanelsApproved, not yet built · 1 MW
Sept 2025
2.2 km away - Biomass
Port Clarence Biomass PlantBeing built · 40 MW
Nov 2015
2.3 km away - Biomass
Billingham Biomass Power StationApproved, not yet built · 50 MW
Oct 20092.3 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major
Wicklow Street, MiddlesbroughHighway improvement works · MIDDLESBROUGH BOROUGH COUNCIL · Road closure
Jun 2026 to Oct 2026
500 m away - Standard
Linthorpe Road, MiddlesbroughNew service connection · NORTHERN GAS NETWORKS · Some carriageway incursion
Oct 2026 to Oct 2026
400 m away - Standard
Whin Street, MiddlesbroughUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · No carriageway incursion
Oct 2026 to Nov 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
6.0 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
6.2 km away - Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
7.7 km away - Decideddecided Jul 2016
8.1 km away - Decideddecided Feb 2024
9.8 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Albert Road Rooftop Solar Panels (rooftop solar, 900 m); Teesside Green Energy Plant (Waste AD) (anaerobic digestion, 1.4 km); Haverton Hill Incinerator (energy from waste, 3.0 km); Billingham Chemical Works (energy from waste, 3.0 km); North East Energy Recovery Centre (adjacent to Teesside EfW) (energy from waste, 3.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.