Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
641hours of spills in 2025 between them (typical neighbourhood: about 36)
144spill events counted
Northumbrian Water
Marske Sewage Treatment Worksinto North Sea · near bathing water: Marske Sands75 spills, 531 hours in 2025
2.0 km away
Northumbrian Water
The Stray Storm Retention Tankinto North Sea · near bathing water: Marske Sands5 spills, 33 hours in 2025
650 m away
Northumbrian Water
New Marske Methodist Churchinto North Sea · near bathing water: Marske Sands19 spills, 25 hours in 2025
550 m away
Northumbrian Water
Bydale School Csointo North Sea · near bathing water: Marske Sands18 spills, 24 hours in 2025
550 m away
Northumbrian Water
Howle Beck Overflows (Marske Cemeteinto North Sea · near bathing water: Marske Sands2 spills, 23 hours in 2025
900 m away
Northumbrian Water
Marske Sewage Treatment Worksinto North Sea · near bathing water: Marske Sands24 spills, 6 hours in 2025
2.0 km away
Northumbrian Water
Dale Street Csointo Long Beck · near bathing water: Marske Sands1 spills, 0 hours in 2025
Wilton International, Teesside - Green Hydrogen PlantApproved, not yet built · 8 MW
Oct 2025 6.1 km away
Battery storage
Tesside GigaPark - Battery Energy Storage SystemPlanning application in · 1,000 MW
May 2026 6.1 km away
Solar farm
North Cote Farm & Park Farm, Dunsdale - Solar ArraysApproved, not yet built · 50 MW
Dec 2022 6.1 km away
Battery storage
A171, Guisborough Woods - Battery Energy Storage SystemApproved, not yet built · 28 MW
Apr 2026 6.1 km away
Energy from waste
Wilton Waste Treatment Plant - Waste to Energy PlantApproved, not yet built
Jan 2026 7.2 km away
Road and street works within 1 km
1 permitted works running now or planned.
Standard
Church Close, Marske By The SeaUtility repair and maintenance works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
The Net Zero Teesside ProjectGenerating Stations · Land at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QW
decided Feb 2024 7.1 km away
Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF
decided Apr 2019 7.1 km away
Pre-application
East Coast Hydrogen Teesside PipelineOther Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
Sainsburys, Morgan Drive - Solar PanelsApproved, not yet built · 190 kW
Jan 2026 7.3 km away
Battery storage
Greystones Road, Grangetown - Battery Energy Storage SystemApproved, not yet built · 60 MW
Dec 2021 7.3 km away
Running nearest: Wilton International (biomass, 5.6 km); Wilton 11 EfW (energy from waste, 5.6 km); Land at Woodhouse Farm (solar farm, 7.3 km); ICI No2 (Teesport) Landfill (landfill gas, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.