What's changing near TS10 5DG
Within 2 km, around Dormanstown in Redcar and Cleveland. Building, planning, schools, transport, prices and crime.
193new homes completed within 2 km, last 2 years
22homes given permission on brownfield sites since 2021
+5.3%like-for-like prices in Dormanstown, 2024 → 2025 (council +4.0%)
-1%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
15 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
1000 m away - New homes
29 new homes completedhouses · Oct 2025 – Sep 2026
Sept 2026
900 m away - New homes
13 new homes completedhouses · May 2025 – Jul 2026
Jul 2026
1.1 km away - New homes
10 new homes completedhouses · Apr 2025 – Apr 2026
Apr 2026
1000 m away - New homes
38 new homes completedhouses · Mar 2025 – Mar 2026
Mar 2026
1.0 km away - New homes
39 new homes completedhouses · Sep 2025 – Jan 2026
Jan 2026
900 m away - New homes
12 new homes completedhouses · Nov 2024 – Jun 2025
Jun 2025
1.1 km away - New homes
9 new homes completedhouses · Dec 2024 – Mar 2025
Mar 2025
1.1 km away - New homes
11 new homes completedhouses · Oct 2024 – Jan 2025
Jan 2025
1.5 km away - New homes
12 new homes completedhouses · Nov 2024
Nov 2024
1.2 km away - Planning permissionSept 2021
2.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 21 m²
34since energy certificates began (2008)
1in TS10 5DG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
132hours of spills in 2025 between them (typical neighbourhood: about 36)
51spill events counted
- Northumbrian Water
Mcclean Avenue Cso (Ref No L15)into Fleet Beck (Trib)15 spills, 54 hours in 2025
550 m away - Northumbrian Water
Harwal Road Cso (Ref. L16)into Fleet Beck16 spills, 32 hours in 2025
750 m away - Northumbrian Water
New Coatham Cso Ref L73into North Sea · near bathing water: Redcar Coatham9 spills, 22 hours in 2025
1.5 km away - Northumbrian Water
West Coatham Lane Csointo Trib Of The Fleet3 spills, 11 hours in 2025
1.3 km away - Northumbrian Water
Locke Park Csointo The Fleet2 spills, 7 hours in 2025
700 m away - Northumbrian Water
Mcclean Avenue Cso (Ref No L15)into Fleet Beck Trib4 spills, 3 hours in 2025
750 m away - Northumbrian Water
Grinkle Road Csointo Unnamed Watercouse - Tees Estu2 spills, 3 hours in 2025
500 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
27 planned, approved or being built and 6 running (100 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Kirkleatham Street - Solar Panel ArrayBeing built · 170 kW
Jan 2022
1.2 km away - Battery storage
Teesworks, Lackenby - Battery Energy StorageApproved, not yet built
Mar 2025
1.2 km away - Rooftop solar
Elring Klinger, Troisdorf Way - Solar PV PanelsApproved, not yet built · 410 kW
Nov 2024
1.9 km away - Solar farm
Yearby Village - Tees Solar FarmApproved, not yet built · 50 MW
Apr 2024
2.6 km away - Hydrogen
Wilton International, Teesside - Green Hydrogen PlantApproved, not yet built · 8 MW
Oct 2025
3.3 km away - Battery storage
Tesside GigaPark - Battery Energy Storage SystemPlanning application in · 1,000 MW
May 2026
3.3 km away - Solar farm
PD Teesport Warehouse A, Bulk Tees - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
3.7 km away - Hydrogen
Wilton Industrial, Plot 1C - Electrolytic Hydrogen FacilityPlanning application in · 60 MW
Oct 2025
3.8 km away - Energy from waste
Redcar Energy CentreApproved, not yet built · 50 MW
Jan 2021
4.0 km away - Energy from waste
Wilton Waste Treatment Plant - Waste to Energy PlantApproved, not yet built
Jan 2026
4.6 km away - Battery storage
Road and street works within 1 km
6 permitted works running now or planned, 4 of them major.
- Major
Sandsend Road, DormanstownUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Oct 2026 to Nov 2026
200 m away - Major
Gordon Road, DormanstownUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Nov 2026
200 m away - Major
Kirkleatham Lane, RedcarUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Nov 2026
200 m away - Major
Broadway East, DormanstownUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Feb 2027
450 m away - Standard
Boulby Road, DormanstownUtility repair and maintenance works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026
300 m away - Minor
Staithes Road, DormanstownOptional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Multi-way signals
Oct 2026 to Oct 2026
250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2024
2.6 km away - Decideddecided Jul 2016
4.4 km away - Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
4.6 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
6.1 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
7.2 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wilton International (biomass, 4.7 km); Wilton 11 EfW (energy from waste, 4.7 km); ICI No2 (Teesport) Landfill (landfill gas, 5.0 km); Imperial Park (anaerobic digestion, 7.1 km); Land at Woodhouse Farm (solar farm, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.