What's changing near TS10 2SN
Within 2 km, around Redcar East in Redcar and Cleveland. Building, planning, schools, transport, prices and crime.
121new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.4%like-for-like prices in Redcar East, 2024 → 2025 (council +4.0%)
-6%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
14 new homes completedhouses · Jun 2026 – Oct 2026
Oct 2026
1.7 km away - New homes
13 new homes completedhouses · Nov 2025 – Oct 2026
Oct 2026
1.7 km away - New homes
9 new homes completedhouses · Nov 2025 – Sep 2026
Sept 2026
1.7 km away - New homes
43 new homes completedhouses · May 2025 – Jul 2026
Jul 2026
1.8 km away - New homes
23 new homes completedhouses · Oct 2025 – May 2026
May 2026
1.9 km away - New homes
7 new homes completedhouses · Mar 2025 – Dec 2025
Dec 2025
1.7 km away - New homes
11 new homes completedhouses · Jul 2025 – Oct 2025
Oct 2025
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 27 m²
48since energy certificates began (2008)
0in TS10 2SN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
48hours of spills in 2025 between them (typical neighbourhood: about 36)
38spill events counted
- Northumbrian Water
New Marske Methodist Churchinto North Sea · near bathing water: Marske Sands19 spills, 25 hours in 2025
1.7 km away - Northumbrian Water
Bydale School Csointo North Sea · near bathing water: Marske Sands18 spills, 24 hours in 2025
1.7 km away - Northumbrian Water
Dale Street Csointo Long Beck · near bathing water: Marske Sands1 spills, 0 hours in 2025
1.7 km away - Northumbrian Water
Oak Road Csointo North Sea · near bathing water: Redcar Stray0 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 5 running (95 MW between them). Those within 5 km are on the map above.
- Solar farm
Yearby Village - Tees Solar FarmApproved, not yet built · 50 MW
Apr 2024
1.2 km away - Rooftop solar
Elring Klinger, Troisdorf Way - Solar PV PanelsApproved, not yet built · 410 kW
Nov 2024
2.3 km away - Rooftop solar
Kirkleatham Street - Solar Panel ArrayBeing built · 170 kW
Jan 2022
2.7 km away - Battery storage
Teesworks, Lackenby - Battery Energy StorageApproved, not yet built
Mar 2025
2.7 km away - Hydrogen
Wilton Industrial, Plot 1C - Electrolytic Hydrogen FacilityPlanning application in · 60 MW
Oct 2025
3.8 km away - Hydrogen
Wilton International, Teesside - Green Hydrogen PlantApproved, not yet built · 8 MW
Oct 2025
4.1 km away - Battery storage
Tesside GigaPark - Battery Energy Storage SystemPlanning application in · 1,000 MW
May 2026
4.1 km away - Energy from waste
Wilton Waste Treatment Plant - Waste to Energy PlantApproved, not yet built
Jan 2026
5.4 km away - Battery storage
Greystones Road, Grangetown - Battery Energy Storage SystemApproved, not yet built · 60 MW
Dec 2021
5.5 km away - Battery storage
Wilton International, Greystones Road - Phase 1Approved, not yet built · 150 MW
Oct 2023
5.5 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
Goodwood Road, RedcarUtility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026
900 m away - Standard
Epsom Road, RedcarUtility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2024
5.1 km away - Decided
Tees CCPPGenerating Stations · Site of the former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF decided Apr 2019
5.2 km away - Decideddecided Jul 2016
6.8 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road. application due September 2026
8.3 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
9.5 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wilton International (biomass, 4.2 km); Wilton 11 EfW (energy from waste, 4.2 km); ICI No2 (Teesport) Landfill (landfill gas, 6.7 km); Land at Woodhouse Farm (solar farm, 6.8 km); Imperial Park (anaerobic digestion, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.