Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
48hours of spills in 2025 between them (typical neighbourhood: about 36)
38spill events counted
Northumbrian Water
New Marske Methodist Churchinto North Sea · near bathing water: Marske Sands19 spills, 25 hours in 2025
1.8 km away
Northumbrian Water
Bydale School Csointo North Sea · near bathing water: Marske Sands18 spills, 24 hours in 2025
1.8 km away
Northumbrian Water
Dale Street Csointo Long Beck · near bathing water: Marske Sands1 spills, 0 hours in 2025
1.8 km away
Northumbrian Water
Oak Road Csointo North Sea · near bathing water: Redcar Stray0 spills, 0 hours in 2025
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 8.2 km away
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
Wilton International, Greystones Road - Phase 1Approved, not yet built · 150 MW
Oct 2023 5.7 km away
Battery storage
Old Hall Farm, Lackenby - BESSPlanning application in · 244 MW
Aug 2025 6.1 km away
Running nearest: Wilton International (biomass, 4.5 km); Wilton 11 EfW (energy from waste, 4.5 km); ICI No2 (Teesport) Landfill (landfill gas, 6.7 km); Land at Woodhouse Farm (solar farm, 7.3 km); Imperial Park (anaerobic digestion, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Other Pipe-lines · A linear route from hydrogen producers in Teesside east to Skinningrove (Redcar and Cleveland Borough Council) and west to Newton Aycliffe (Durham County Council) via Cowpen Bewley, with spurs to off takers branching off the main route of the pipeline including north towards Hartlepool (Hartlepool Borough Council).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.