Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
168hours of spills in 2025 between them (typical neighbourhood: about 36)
81spill events counted
South West Water
Stockmeadow House Csointo Tributary O Teign Estuary(S)47 spills, 79 hours in 2025
200 m away
South West Water
Bishopsteignton Psinto Teign Estuary7 spills, 44 hours in 2025
650 m away
South West Water
Horns Close Csointo Surface Water Sewer (S)24 spills, 44 hours in 2025
650 m away
South West Water
Broadmeadow Psinto Teign Estuary(E)3 spills, 1 hours in 2025
10 planned, approved or being built and 4 running (43 MW between them). Those within 5 km are on the map above.
Rooftop solar
East Golds Works, Kingsteignton Road - Solar PanelsApproved, not yet built · 1 MW
Feb 2025 4.8 km away
Rooftop solar
Sibelco UK Preston Manor Works, Kingsteignton - Solar PanelsApproved, not yet built · 790 kW
Jan 2025 5.5 km away
Solar farm
Court Barton Farm, Coffinswell - Solar FarmApproved, not yet built · 21 MW
Aug 2023 5.5 km away
Solar farm
Torbay Hospital, Nightingale Park - Solar Panel ArrayApproved, not yet built · 3 MW
Jun 2022 7.2 km away
Solar farm
Langdon Hospital, Langdon - Solar PanelsPlanning application in
Nov 2025 7.2 km away
Battery storage
Langdon Hospital, Langdon - Battery Energy Storage SystemPlanning application in
Nov 2025 7.2 km away
Battery storage
Kingskerswell - Micro Energy Storage FacilityPlanning application in · 200 kW
Jul 2024 7.4 km away
Solar farm
Apple Tree CloseApproved, not yet built · 5 MW
May 2016 8.3 km away
Rooftop solar
Paramount 21, Old Newton Road - Solar PV SystemApproved, not yet built · 380 kW
May 2026 9.0 km away
Rooftop solar
Brooke House, Sabre Close - Solar PanelsApproved, not yet built · 280 kW
Dec 2022 9.0 km away
Running nearest: Sawmills Solar Farm (solar farm, 4.4 km); Heathfield 'C' Landfill Scheme (landfill gas, 5.6 km); Barton Hill Industrial Park - Battery Energy Storage Facility (battery storage, 7.3 km); Rydon Farm (solar farm, 8.5 km).
Road and street works within 1 km
1 permitted works running now or planned.
Minor
Newton Road, BishopsteigntonUtility asset works · BT · Two-way signals
Oct 2026 to Oct 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Marsh Barton stationNew station in Exeter, opened July 2023
Jul 2023 17.1 km away
The longer view
Like-for-like prices in Bishopsteignton & Shaldon: +15% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.8% in two years.