What's changing near TQ14 9GZ
Within 2 km, around Teignmouth North in Teignbridge. Building, planning, schools, transport, prices and crime.
22new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.2%like-for-like prices in Teignmouth North, 2024 → 2025 (council -0.2%)
-14%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 31 m²
38since energy certificates began (2008)
1in TQ14 9GZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
17storm overflows within 2 km
242hours of spills in 2025 between them (typical neighbourhood: about 36)
151spill events counted
- South West Water
King George'S Field Psinto Teign Estuary(E) · near bathing water: Shaldon24 spills, 71 hours in 2025
1.4 km away - South West Water
Woodland Ave Csointo Stream Dis To Lyme Bay (S) · near bathing water: Teignmouth Holcombe46 spills, 68 hours in 2025
1.7 km away - South West Water
Station Car Park Csointo Lyme Bay (Via Surf Wtr Sewer) · near bathing water: Teignmouth Town15 spills, 32 hours in 2025
1.3 km away - South West Water
Bitton Park Road Csointo Teign Estuary(E)17 spills, 25 hours in 2025
900 m away - South West Water
Bitton Park Road Jct 2nd Avenue Csointo Teign Estuary(E)8 spills, 23 hours in 2025
900 m away - South West Water
Ringmore Road Csointo Teign Estuary (E)14 spills, 12 hours in 2025
1.7 km away - South West Water
Bitton Park Rugby Club Csointo Teign Estuary (E)4 spills, 5 hours in 2025
900 m away - South West Water
Fire Station Csointo Bitton Brook (S)4 spills, 2 hours in 2025
550 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
7 planned, approved or being built and 3 running (31 MW between them). Those within 5 km are on the map above.
- Solar farm
Langdon Hospital, Langdon - Solar PanelsPlanning application in
Nov 2025
5.7 km away - Battery storage
Langdon Hospital, Langdon - Battery Energy Storage SystemPlanning application in
Nov 2025
5.7 km away - Solar farm
Court Barton Farm, Coffinswell - Solar FarmApproved, not yet built · 21 MW
Aug 2023
6.9 km away - Rooftop solar
East Golds Works, Kingsteignton Road - Solar PanelsApproved, not yet built · 1 MW
Feb 2025
7.1 km away - Rooftop solar
Sibelco UK Preston Manor Works, Kingsteignton - Solar PanelsApproved, not yet built · 790 kW
Jan 2025
7.7 km away - Solar farm
Torbay Hospital, Nightingale Park - Solar Panel ArrayApproved, not yet built · 3 MW
Jun 2022
8.0 km away - Battery storage
Kingskerswell - Micro Energy Storage FacilityPlanning application in · 200 kW
Jul 2024
8.6 km away
Running nearest: Sawmills Solar Farm (solar farm, 4.6 km); Heathfield 'C' Landfill Scheme (landfill gas, 7.7 km); Barton Hill Industrial Park - Battery Energy Storage Facility (battery storage, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
12 permitted works running now or planned, 9 of them major.
- Major, planned
Dunning Walk, TeignmouthUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Nov 2026 to Dec 2026
150 m away - Major
Dunning Walk, TeignmouthUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Nov 2026 to Dec 2026
150 m away - Major, planned
Nelson Close, TeignmouthUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Jan 2027 to Feb 2027
250 m away - Major
Footpaths For Lake Avenue, TeignmouthUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Jan 2027 to Feb 2027
350 m away - Major, planned
Admirals Walk, TeignmouthUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Nov 2026 to Dec 2026
700 m away - Major
Admirals Walk, TeignmouthUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Nov 2026 to Dec 2026
700 m away - Major
Footpath From Higher Exeter Road To Gilbert Avenue, TeignmouthUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Nov 2026 to Dec 2026
750 m away - Major
Frobisher Close, TeignmouthUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Oct 2026 to Nov 2026
800 m away - Major, planned
Grove Avenue, TeignmouthUtility repair and maintenance works · National Grid Electricity Distribution (South West) · Road closure
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km