Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
240hours of spills in 2025 between them (typical neighbourhood: about 36)
139spill events counted
South West Water
King George'S Field Psinto Teign Estuary(E) · near bathing water: Shaldon24 spills, 71 hours in 2025
1.5 km away
South West Water
Woodland Ave Csointo Stream Dis To Lyme Bay (S) · near bathing water: Teignmouth Holcombe46 spills, 68 hours in 2025
1.4 km away
South West Water
Station Car Park Csointo Lyme Bay (Via Surf Wtr Sewer) · near bathing water: Teignmouth Town15 spills, 32 hours in 2025
250 m away
South West Water
Bitton Park Road Csointo Teign Estuary(E)17 spills, 25 hours in 2025
1.1 km away
South West Water
Bitton Park Road Jct 2nd Avenue Csointo Teign Estuary(E)8 spills, 23 hours in 2025
7 planned, approved or being built and 3 running (31 MW between them). Those within 5 km are on the map above.
Solar farm
Langdon Hospital, Langdon - Solar PanelsPlanning application in
Nov 2025 6.0 km away
Battery storage
Langdon Hospital, Langdon - Battery Energy Storage SystemPlanning application in
Nov 2025 6.0 km away
Solar farm
Court Barton Farm, Coffinswell - Solar FarmApproved, not yet built · 21 MW
Aug 2023 7.0 km away
Solar farm
Torbay Hospital, Nightingale Park - Solar Panel ArrayApproved, not yet built · 3 MW
Jun 2022 7.8 km away
Rooftop solar
East Golds Works, Kingsteignton Road - Solar PanelsApproved, not yet built · 1 MW
Feb 2025 7.9 km away
Battery storage
Kingskerswell - Micro Energy Storage FacilityPlanning application in · 200 kW
Jul 2024 8.6 km away
Rooftop solar
Sibelco UK Preston Manor Works, Kingsteignton - Solar PanelsApproved, not yet built · 790 kW
Jan 2025 8.8 km away
Running nearest: Sawmills Solar Farm (solar farm, 5.7 km); Barton Hill Industrial Park - Battery Energy Storage Facility (battery storage, 7.7 km); Heathfield 'C' Landfill Scheme (landfill gas, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
Major, planned
Grove Avenue, TeignmouthUtility repair and maintenance works · National Grid Electricity Distribution (South West) · Road closure
Nov 2026 to Nov 2026 500 m away
Major, planned
Road From The Lifeboat Station To The Point, TeignmouthUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 800 m away
Major
Road From The Lifeboat Station To The Point, TeignmouthUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Marsh Barton stationNew station in Exeter, opened July 2023
Jul 2023 17.6 km away
The longer view
Like-for-like prices in Teignmouth South: +20% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.8% in two years.