Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
426hours of spills in 2025 between them (typical neighbourhood: about 36)
63spill events counted
South West Water
The Butts Psinto Trib Of River Teign(S)36 spills, 310 hours in 2025
1.2 km away
South West Water
Homers Lane Csointo Trib O Riv.Teign Via Sw Sewer21 spills, 107 hours in 2025
1.1 km away
South West Water
Hackney Psinto Trib Of R.Teign(S)6 spills, 9 hours in 2025
11 planned, approved or being built and 4 running (43 MW between them). Those within 5 km are on the map above.
Rooftop solar
East Golds Works, Kingsteignton Road - Solar PanelsApproved, not yet built · 1 MW
Feb 2025 1.8 km away
Rooftop solar
Sibelco UK Preston Manor Works, Kingsteignton - Solar PanelsApproved, not yet built · 790 kW
Jan 2025 2.2 km away
Solar farm
Apple Tree CloseApproved, not yet built · 5 MW
May 2016 5.3 km away
Solar farm
Court Barton Farm, Coffinswell - Solar FarmApproved, not yet built · 21 MW
Aug 2023 5.6 km away
Rooftop solar
Brooke House, Sabre Close - Solar PanelsApproved, not yet built · 280 kW
Dec 2022 5.6 km away
Rooftop solar
Paramount 21, Old Newton Road - Solar PV SystemApproved, not yet built · 380 kW
May 2026 5.6 km away
Battery storage
Newton Road, Bovey Tracey - Micro Energy Storage FacilityPlanning application in · 200 kW
Jul 2024 6.7 km away
Battery storage
Newton Road & Pottery Road, Bovey Tracey - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026 6.7 km away
Battery storage
Kingskerswell - Micro Energy Storage FacilityPlanning application in · 200 kW
Jul 2024 7.1 km away
Solar farm
Torbay Hospital, Nightingale Park - Solar Panel ArrayApproved, not yet built · 3 MW
Jun 2022 7.8 km away
Road and street works within 1 km
6 permitted works running now or planned, 4 of them major.
Major
Whiteway Road, KingsteigntonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Jan 2027 to Mar 2027 750 m away
Major, planned
Lindridge Hill, KingsteigntonUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 800 m away
Major
Lindridge Hill, KingsteigntonUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 800 m away
Major
Clifford Avenue, KingsteigntonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Sept 2026 to Oct 2026 850 m away
Standard
Exeter Road, KingsteigntonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Multi-way signals
Oct 2026 to Oct 2026 750 m away
Standard
Haytor Park, KingsteigntonUtility repair and maintenance works · SOUTH WEST WATER · Give and take
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Marsh Barton stationNew station in Exeter, opened July 2023
Jul 2023 17.7 km away
The longer view
Like-for-like prices in Bishopsteignton & Shaldon: +15% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.8% in two years.