Country England and Wales › Region South East › Council Wealden › Neighbourhood Buxted, Framfield & Rotherfield › Postcode TN6 3RG What's changing near TN6 3RG Within 2 km, around Buxted, Framfield & Rotherfield in Wealden. Building, planning, schools, transport, prices and crime.
198 new homes completed within 2 km, last 2 years
33 homes given permission on brownfield sites since 2021
-0.5% like-for-like prices in Buxted, Framfield & Rotherfield, 2024 → 2025 (council +0.2%)
+8% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 53 new homes completed 20 flats, 33 houses · Nov 2024 – Aug 2026
Aug 2026 550 m away New homes 6 new homes completed houses · Feb 2025 – May 2026
May 2026 750 m away New homes 8 new homes completed houses · Nov 2024 – Apr 2026
Apr 2026 750 m away New homes 15 new homes completed houses · Feb 2025 – Mar 2026
Mar 2026 950 m away New homes 38 new homes completed 10 flats, 28 houses · Jan 2025 – Feb 2026
Feb 2026 850 m away New homes 9 new homes completed flats · Jun 2025 – Sep 2025
Sept 2025 1.8 km away New homes 16 new homes completed houses · Feb 2025 – Aug 2025
Aug 2025 650 m away New homes 9 new homes completed 5 flats, 4 houses · Dec 2024 – May 2025
May 2025 850 m away New homes 9 new homes completed houses · Nov 2024 – Apr 2025
Apr 2025 600 m away Planning permission May 2023 1.9 km away Planning permission 0 homes extended 2021–2025
0 since energy certificates began (2008)
0 in TN6 3RG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 5 storm overflows within 2 km
253 hours of spills in 2025 between them (typical neighbourhood: about 36)
57 spill events counted
Southern Water Sewer Maynards Gate Pumping Stn into Freshwater River 32 spills, 162 hours in 2025
1.9 km away Southern Water Jarvis Brook Cso into Jarvis Brook 12 spills, 74 hours in 2025
1.9 km away Southern Water Millbrook Business Park Cso into Freshwater River 7 spills, 13 hours in 2025
1.6 km away Southern Water Alderbrook Way Cso into Jarvis Brook 3 spills, 3 hours in 2025
750 m away Southern Water Alderbrook Way Cso into Jarvis Brook 3 spills, 2 hours in 2025
750 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 9 planned, approved or being built and 0 running. Those within 5 km are on the map above.
Rooftop solar ervomex Limited, Sybron Way - Solar Panels Approved, not yet built · 240 kW
Oct 2023 1.8 km away Rooftop solar Servomex Limited, Sybron Way - Solar Panels Approved, not yet built · 160 kW
Dec 2024 1.8 km away Rooftop solar Horder Centre, St Johns Road - Solar panels Approved, not yet built · 320 kW
May 2024 4.1 km away Rooftop solar Utopia Leisure Centre, Downsview Crescent - Solar Panels Approved, not yet built · 280 kW
Aug 2025 8.3 km away Rooftop solar Uckfield Leisure Centre - Solar PV System Being built
Dec 2025 8.3 km away Rooftop solar Co Op, High Street - Solar Panels Approved, not yet built · 230 kW
May 2025 8.6 km away Solar farm Silveroaks Farm, Hawkhurst Lane - Solar Panels Approved, not yet built · 190 kW
Mar 2025 9.2 km away Rooftop solar Fastener House, Bolton Close - Solar Panels Approved, not yet built · 560 kW
Sept 2024 9.9 km away Battery storage Fastener House, Bolton Close - Batter Storage Planning application in · 40 kW
Jul 2024 9.9 km away DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 28.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.